Please choose a project below related to this category.
The various pulses are part of the normal diet of all vegetarians and are also used frequently by non-vegetarians too. They are the main sources of pr...
|
Capacity : 36000 MT/Annum |
Plant and Machinery cost: 76 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 58.00 |
|
Break Even Point (BEP): 20.00 |
TCI : 409 Lakhs |
|
Cost of Project : 0 |
Gum Arabic is a key issue of the ecological and economical development, as it is often the main sources of revenue for semi-nomadic African people who...
|
Capacity : 3600 MT/Annum |
Plant and Machinery cost: 86 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 50.00 |
|
Break Even Point (BEP): 25.00 |
TCI : 1231 Lakhs |
|
Cost of Project : 0 |
The bamboos are a group of woody perennial evergreen plants in the true grass family poaceae, subfamily bambusoideae, tribe bambuseae. Some are giant...
|
Capacity : 14400.00 SETS/Annum |
Plant and Machinery cost: 5 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 48.00 |
|
Break Even Point (BEP): 41.00 |
TCI : 138 Lakhs |
|
Cost of Project : 0 |
Rice milling industry generates a lot of rice husk during milling of paddy which comes from the fields. This rice husk is mostly used as a fuel in the...
|
Capacity : 90000 KGS/Annum |
Plant and Machinery cost: 246 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 39.00 |
|
Break Even Point (BEP): 47.00 |
TCI : 557 Lakhs |
|
Cost of Project : 0 |
Rice is the one of the most important food grains. It is used in almost all homes as eatables. It has good filling capacity as a food grains. Rice is...
|
Capacity : 38.67 MT/DAY |
Plant and Machinery cost: 57 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 31.00 |
TCI : 857 lakhs |
|
Cost of Project : 0 |
Poha Industry comprises an important segment of Industrial activity in food processing industry in the country. It provides nutritious breakfast and f...
|
Capacity : 10.00 MT/day |
Plant and Machinery cost: 27 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 40.00 |
TCI : 223 lakhs |
|
Cost of Project : 0 |
-
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Modern diagnostic centre provides a wide scope for detection of ailments and afford facilities for a detailed medical check-up through diagnostic proc...
|
Capacity : Different types of Medical Testing |
Plant and Machinery cost: 72 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 35.00 |
|
Break Even Point (BEP): 55.00 |
TCI : 144 Lakhs |
|
Cost of Project : 0 |
DAIRY FARMING AND MILK PRODUCTS (Ghee, Pasturised Milk in Poly Pack), Cow Urine Processing and Packing in ½ Ltr. Glass Bottles with Biogas Plant...
|
Capacity : - |
Plant and Machinery cost: 162 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 47.00 |
|
Break Even Point (BEP): 32.00 |
TCI : 1665 Lakhs |
|
Cost of Project : 0 |
Cancer is a term used for diseases in which abnormal cells divide without control and are able to invade other tissues. Cancer cells can spread to oth...
|
Capacity : - |
Plant and Machinery cost: 501 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 35.00 |
TCI : Cost of Project : 699 Lakhs |
|
Cost of Project : 0 |
Cancer is a term used for diseases in which abnormal cells divide without control and are able to invade other tissues. Cancer cells can spread to oth...
|
Capacity : - |
Plant and Machinery cost: 501 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 35.00 |
TCI : Cost of Project : 699 Lakhs |
|
Cost of Project : 0 |
Sorbitol, also known as glucitol, is a sugar alcohol that the body metabolises slowly. It is obtained by reduction of glucose changing the aldehyde gr...
|
Capacity : 4500 MT/Annum |
Plant and Machinery cost: 65 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 69.00 |
TCI : Cost of Project : 186 Lakhs |
|
Cost of Project : 0 |