Please choose a project below related to this category.
Surgical cotton buds/swabs are an essential consumer item. It is used daily by people and are hugely in demand in the hospitals, nursing homes, dispe...
|
Capacity : 75000 Nos/Day |
Plant and Machinery cost: Rs. 6 Lacs |
|
Working Capital : Rs. 9 Lacs |
Rate of Return (ROR): 57.38 |
|
Break Even Point (BEP): 49.35 |
TCI : Rs. 21 Lacs |
|
Cost of Project : 0 |
In many rural areas, the materials for building rabbit cages and insulated housings and electricity are often not available. Hence, management of rabb...
|
Capacity : Plant Capacity : 5000 Rabbit Farming,100 Kgs Yarn Wool /Day |
Plant and Machinery cost: Rs. 611 Lakhs |
|
Working Capital : Rs. 104 Lakhs |
Rate of Return (ROR): 61.86 |
|
Break Even Point (BEP): 36.56 |
TCI : Rs. 920 Lakhs |
|
Cost of Project : 0 |
Poultry farming has grown into a full-fledged commercial agro business. The demand for eggs and broiler meat are on the increase with growing populati...
|
Capacity : 8,000 Broilers/ Annum1.5 Lac Eggs/ Annum1000 Birds / Annum |
Plant and Machinery cost: Rs. 28,700 |
|
Working Capital : Rs. 87,460 |
Rate of Return (ROR): 19.58 |
|
Break Even Point (BEP): 56.18 |
TCI : Rs. 8.21 Lakhs |
|
Cost of Project : 0 |
Paper being one of the basic needs of life, it occupies an important position in the world. Paper made from rice and wheat husk is widely used for man...
|
Capacity : 150 MT /Day |
Plant and Machinery cost: Rs. 340 Lakhs |
|
Working Capital : Rs. 1600 Lakhs |
Rate of Return (ROR): 81.74 |
|
Break Even Point (BEP): 35.60 |
TCI : Rs. 2499 Lakhs |
|
Cost of Project : 0 |
Coal washing unit is one of the most important unit for upgradation of coal in sense of fed value by reducing of ash contents in the coal. It is basic...
|
Capacity : 11700 MT/Day |
Plant and Machinery cost: Rs. 3200 Lakhs |
|
Working Capital : Rs. 891 Lakhs |
Rate of Return (ROR): 6.36 |
|
Break Even Point (BEP): 0.00 |
TCI : Rs. 7241 Lakhs |
|
Cost of Project : 0 |
Diamond blade is an instrument or cutting machines, which is broadly used for cutting of very hard materials. It is basically manufactured by using of...
|
Capacity : 20000 Nos./Day |
Plant and Machinery cost: Rs. 81 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.90 |
|
Break Even Point (BEP): 73.60 |
TCI : Rs. 143 Lakhs |
|
Cost of Project : 0 |
Enameled wire is an insulated wire used in winding of armatures in transformers, switch gears and other electrical equipments. When connected to the m...
|
Capacity : 500 Kgs/Day |
Plant and Machinery cost: Rs. 22 Lakhs |
|
Working Capital : Rs. 52.0 Lakhs |
Rate of Return (ROR): 37.43 |
|
Break Even Point (BEP): 46.95 |
TCI : Rs. 114 Lakhs |
|
Cost of Project : 0 |
Glass Reinforced Concrete is a composite consisting of a mortar of hydraulic cement & fine aggregate reinforced with alkali resistant glass fibres. GR...
|
Capacity : 20 MT/Day |
Plant and Machinery cost: Rs. 14 Lakhs |
|
Working Capital : Rs. 34 Lakhs |
Rate of Return (ROR): 39.36 |
|
Break Even Point (BEP): 43.79 |
TCI : Rs. 81 Lakhs |
|
Cost of Project : 0 |
Bagasse is one of the major by product of sugar crushing industries. Charcoal is a highly porous form of amorphous carbon. It is one of the half burn...
|
Capacity : 2.0 MT/Day |
Plant and Machinery cost: Rs. 53.0 Lakhs |
|
Working Capital : Rs. 25 Lakhs |
Rate of Return (ROR): 26.41 |
|
Break Even Point (BEP): 62.20 |
TCI : Rs. 154 Lakhs |
|
Cost of Project : 0 |
In major importing countries coconut shell charcoal is mainly used in the manufacturing of activated carbon. All the production units are enjoy highe...
|
Capacity : 1.0 MT/Day |
Plant and Machinery cost: Rs. 6 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.25 |
|
Break Even Point (BEP): 48.36 |
TCI : Rs. 19 Lakhs |
|
Cost of Project : 0 |
Nicotine finds wide application in agriculture and other fields. In agriculture it is used in the form of nicotine sulphate solution to control differ...
|
Capacity : 30 litres/Day |
Plant and Machinery cost: Rs. 27.00 Lacs |
|
Working Capital : - |
Rate of Return (ROR): 47.00 |
|
Break Even Point (BEP): 45.00 |
TCI : Rs. 125.00 Lacs |
|
Cost of Project : 0 |
Activated wood charcoal is a very important chemical widely employed by certain gases and vapours in purification in catalytic chemical reactions and...
|
Capacity : 15MT/Day |
Plant and Machinery cost: Rs. 80 Lakhs |
|
Working Capital : Rs. 113 Lakhs |
Rate of Return (ROR): 24.13 |
|
Break Even Point (BEP): 62.30 |
TCI : Rs. 262 Lakhs |
|
Cost of Project : 0 |