Corn flakes being one of the most nutritious food and is consumed as breakfast food not only in India but elsewhere in the world. Basically it is prep...
|
Capacity : 5 Tones/Day |
Plant and Machinery cost: 89 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 35.00 |
|
Break Even Point (BEP): 47.00 |
TCI : 324 Lakhs |
|
Cost of Project : 0 |
The principal methods for producing copper powder is electrolytic deposition at high current densities and the atomization of molten metal. Copper pow...
|
Capacity : 150 MT/Day |
Plant and Machinery cost: 45 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 39.00 |
|
Break Even Point (BEP): 63.00 |
TCI : 158 Lakhs |
|
Cost of Project : 0 |
Cashew was introduced in India by the Portuguese four centuries ago mainly to prevent soil eorosion. Cashew ranks second among the nine tree nuts whic...
|
Capacity : 500 KG/Day |
Plant and Machinery cost: 22 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 49.00 |
|
Break Even Point (BEP): 34.00 |
TCI : 154 Lakhs |
|
Cost of Project : 0 |
Rumen by pass fat supplement the diet of livestock with unsaturated fatty acids. Unsaturated fatty acid are known to be more digestable and are more b...
|
Capacity : 300MT/Annum |
Plant and Machinery cost: Rs. 24 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 39.00 |
|
Break Even Point (BEP): 62.00 |
TCI : Rs. 98 Lakhs |
|
Cost of Project : 0 |
Meter Gauge Concrete Sleeper has a resilient bar; attached with flanges, key insert, refraining black and rail. It can bear variable compression load...
|
Capacity : 100.00 NOS/day |
Plant and Machinery cost: Rs. 42 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 36.00 |
TCI : Rs. 254 Lakhs |
|
Cost of Project : 0 |
Rice husk gives a good quality of pozzolanio ash containing silica, which is considered a good substitute for cement. It is prepared by first burning...
|
Capacity : 50 MT/day |
Plant and Machinery cost: Rs. 98 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 54.00 |
TCI : Rs. 203 Lakhs |
|
Cost of Project : 0 |
Banana powder is prepared from pulp of fruits after mashing and drying in a drum or spray driers. Then dried product is pulverized and passed through...
|
Capacity : 1000.00 KG./day |
Plant and Machinery cost: Rs. 21 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 45.00 |
TCI : Rs. 117 Lakhs |
|
Cost of Project : 0 |
Admixtures are materials added to the concrete before or during its mixing, with a view to modify one or more of the properties of concrete in the pla...
|
Capacity : 500 kg. Air Entraining Admix, 500 kg. Accelerating Admixture, 500 kg. Retarding Admixture, 500 kg. Water Reducing Admix (PER DAY) |
Plant and Machinery cost: Rs. 10 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 51.00 |
|
Break Even Point (BEP): 31.00 |
TCI : Rs. 162 Lakhs |
|
Cost of Project : 0 |
Potatoes are consumed in varied forms all over the world. They are also processed into powder form in order to prevent-their spoilage. Potato Powder i...
|
Capacity : 6.00 TON/day |
Plant and Machinery cost: Rs. 200 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 49.00 |
|
Break Even Point (BEP): 40.00 |
TCI : Rs. 500 Lakhs |
|
Cost of Project : 0 |
Copper Sulphate is blue crystalline granule or powdery white when dehydrated and has a nauseous metallic taste. It is manufactured by the reaction of...
|
Capacity : 600 MT/Annum |
Plant and Machinery cost: Rs. 69 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 37.00 |
|
Break Even Point (BEP): 63.00 |
TCI : Cost of Project Rs. 205 Lakhs |
|
Cost of Project : 0 |
Precipitated silica (also called particulate silica) is compound of aggregates of ultimate particles of colloidal size that have not become linked in...
|
Capacity : 2 Ton/Day |
Plant and Machinery cost: 38 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 41.00 |
TCI : 174 Lakhs |
|
Cost of Project : 0 |
The genus comprises 50-60 species of shrubs or small trees indigenous to tropical Africa and Asia. Among them 4 or 5 species are important as sources...
|
Capacity : 1.80 Ton/Day |
Plant and Machinery cost: 15 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 49.00 |
|
Break Even Point (BEP): 28.00 |
TCI : 325 Lakhs |
|
Cost of Project : 0 |