Establishment of numerous development entities like Gambia Vision 2050, that profiles the country development pathway on a comprehensive term and the coming to being of an eventual self-sufficient socio-economic society by 2050, and, more recently the National Development Plan 2023–2027 that, further reinvestment in the private sector, intensifies industrialization and economic diversification, all the while maintaining a safe investment political stability adaptable to create a quality space, and elevated infrastructure base. In incremental paces, The Gambia is becoming a regional trade, logistics, production, and agro-industrial hub, henceforth an extensive range of possible forestry, tourism, soft manufacture, renewable power, ICT etc. investment opportunities.
Entrepreneurs can tap into high-potential sectors aligned with the government’s economic diversification goals:
Market Demand
The Gambia’s economy’s gradual transformation has increased demand in various sectors:
The Gambia Investment and Export Promotion Agency (GIEPA) provides a wide range of investor incentives, including:
In light of the aforementioned detailed analysis, in a politically stable environment, arable land, a youthful population, and a strategic regional location, the focus on industrialization through the private sector, the Gambia will undoubtedly attract investment. In energy—agro-processing, fisheries, renewable energy, ICT, tourism, regional integration, and light manufacturing focus are ripe for growth under the vision 2050 framework. In sum, the Gambia is progressively becoming a hub to the West African market and a pace of sustainable and inclusive growth in the region.
Please choose a project below related to this category.
Cashew (Botanical name Anacardium Occidentale) is introduced in India by the portugese four centuries ago mainly to prevent soil errosion. Cashew rank...
|
Capacity : 21 MT/Day C.N.S.L |
Plant and Machinery cost: 42 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 51.00 |
|
Break Even Point (BEP): 34.00 |
TCI : 501 Lakhs |
|
Cost of Project : 0 |
Water everywhere, not a CLEAN drop to drink! Who would have thought that there will be a day when sanitation of available water would be more of a co...
|
Capacity : 30,000 Thousand Nos./Annum or 1,00,000 Bottles /day |
Plant and Machinery cost: Rs. 105 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 63.00 |
TCI : Cost of Project : Rs. 282 Lakhs |
|
Cost of Project : 28200000 |
Soaps are the earliest form of detergents. Though at present the term detergent is used for synthetic detergent derived from petroleum products. The o...
|
Capacity : Detergent Cake, Powder, Dish washing Cake & Powder Each 1 MT/Day = 4 MT/Day |
Plant and Machinery cost: 28 Lakh |
|
Working Capital : - |
Rate of Return (ROR): 47.00 |
|
Break Even Point (BEP): 37.00 |
TCI : 239 Lakh |
|
Cost of Project : 0 |
-
|
Capacity : 1.0 MT/Day |
Plant and Machinery cost: Rs. 69 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 54.00 |
TCI : Rs. 247 Lakhs |
|
Cost of Project : 0 |
Refined vegetable oil is considered to be high quality edible oil because of its non-cholesterol properties. Its main use in the world is in cooking,...
|
Capacity : 75 MT / Day |
Plant and Machinery cost: 141 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 55.00 |
|
Break Even Point (BEP): 22.00 |
TCI : 3395 Lakhs |
|
Cost of Project : 0 |
There are thousands of frozen foods available. Before freezing, it is necessary to blend the product to destroy enzymes, which would result on off fla...
|
Capacity : 20 MT / Day |
Plant and Machinery cost: 81 Lakh |
|
Working Capital : - |
Rate of Return (ROR): 53.00 |
|
Break Even Point (BEP): 31.00 |
TCI : 1090 Lakh |
|
Cost of Project : 0 |
Matchbox is one of the most important items. Though it is looked upon as small and insignificant, earlier it was a big problem. In the 17th century,...
|
Capacity : 50000 Nos. /Day |
Plant and Machinery cost: Rs. 5 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 52.00 |
TCI : Rs. 29 Lakhs |
|
Cost of Project : 0 |
Fruit juices are health drinks; it is largely used throughout the society and popularity of fruit juices are gradually increasing. There is good scope...
|
Capacity : Mango Juice 3600 KLs., Orange Juice 3600 KLs,Litchi Juice 3600 KLs,Sugarcane Juice 720 KLs Per Annum |
Plant and Machinery cost: 275 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 52.00 |
TCI : Cost of Project : 726 Lakhs |
|
Cost of Project : 0 |
Disposable needle is widely used by doctors for injection purpose with the help of syringes. With the increase in population in our country, requirem...
|
Capacity : - |
Plant and Machinery cost: 147 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 47.00 |
TCI : Cost of Project : 426 Lakhs |
|
Cost of Project : 0 |
Contract farming is most commonly practiced by food processing firms. These firms have an interest in keeping raw material inflows at a stable level,...
|
Capacity : 75000 Nos. Bottles Fruit Juice / Day, 150 MT Fresh Fruit for Fruit Juice |
Plant and Machinery cost: 144 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 55.00 |
|
Break Even Point (BEP): 22.00 |
TCI : 29 Crores |
|
Cost of Project : 0 |
Now-a-days people are turning to fresh-water fish such as rainbow trout, carp & tench. These fish make an attractive substitute for the unproductive...
|
Capacity : 4.00 Ton /Day |
Plant and Machinery cost: 82 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 53.00 |
|
Break Even Point (BEP): 31.00 |
TCI : 558 Lakhs |
|
Cost of Project : 0 |
Fish is used as a source of food either in raw or dry state. It has protein which is amino acids. Another means of utilization of fish is the manufact...
|
Capacity : 1 MT/day Fish Oil. 2.3 MT/day Fish Meal. |
Plant and Machinery cost: 63 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 48.00 |
|
Break Even Point (BEP): 34.00 |
TCI : 219 Lakhs |
|
Cost of Project : 0 |