The first group includes the following main resources:
Entrepreneurs can target high-potential sectors that align with Karnataka’s competitive advantages:
However, Karnataka typically provides the sectoral and region-specific facilitations as follows:
- Single-window clearance and industry facilitation agencies for approvals, land allotment;
- sectoral incentives (electronics, biotech, aerospace, EVs) like capital subsidies, interest reimbursement, GST/tax concessions in approved cases;
- industrial land and plug-and-play facilities via state industrial development authorities, and private industrial parks;
- R&D and incubation grants, testing labs, and skill-development partnerships to speed up tech commercialization.
That long innovation velocity of a leading global tech center mature, though mature manufacturing clusters and heartland rural agricultural zones like us.
A competitive advantage that is virtually a hybrid one which would involve both the intensive start-ups of knowledge as well as manufacturing/processing projects. Additionally and beside the above, there is technology, biotechnology, aerospace, electronics, green power, and agro-value addition as far as either of which go, some scaling options and supportive public-private even for those at the level of angel investors and keyword the entrepreneur ventures that are already favored.
Please choose a project below related to this category.
The principal feed resources for animal consumption in the country are crop residues like straws of wheat, rice and other cereals and stovers, which a...
|
Capacity : 100 MT/Day |
Plant and Machinery cost: Rs 277 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.22 |
|
Break Even Point (BEP): 48.23 |
TCI : Cost of Project: Rs 869 Lakhs |
|
Cost of Project : 86900000 |
A restaurant is simply a place to have food outside your home. It is smaller in size than a hotel as it does not have accommodation facilities. It is...
|
Capacity : Restaurant (Veg. - Non-Veg.): 150 Nos/Day, Beer: 330 Pitchers/Day, Alcohol : 100 Nos/Day, Fresh Fruit Juice: 500 Nos/Day |
Plant and Machinery cost: Rs 189 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.28 |
|
Break Even Point (BEP): 63.08 |
TCI : Cost of Project: Rs 392 Lakhs |
|
Cost of Project : 39200000 |
There has been a dramatic increase in the number of reverse osmosis and nano-filtration plant over the past ten years. There has also been a prolifera...
|
Capacity : Capacity Antiscalants: 5MT/Day, Membrane Cleaners: 5 MT/Day |
Plant and Machinery cost: Rs 88 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.82 |
|
Break Even Point (BEP): 63.96 |
TCI : Cost of Project: Rs 613 Lakhs |
|
Cost of Project : 61300000 |
Leather is considered as a symbol of fashion, uniqueness, trend and styles. The demand for quality leather products as well as accessories never cease...
|
Capacity : - |
Plant and Machinery cost: Rs 28 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.37 |
|
Break Even Point (BEP): 58.01 |
TCI : Cost of Project: Rs 264 Lakhs |
|
Cost of Project : 26400000 |
Cement is a material with adhesive and cohesive properties which make it capable of bonding minerals fragments into a compact whole. It can be defined...
|
Capacity : 200 MT/Day |
Plant and Machinery cost: Rs 755 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 17.22 |
|
Break Even Point (BEP): 61.78 |
TCI : Cost of Project: Rs 1254 Lakhs |
|
Cost of Project : 125400000 |
A wire or combination or wires not insulated from one another, suitable for carrying a single electric current is called conductor. The term conductor...
|
Capacity : • All Aluminium Alloy Conductor: 10 MT/Day, Aluminium Conductor Steel Reinforced : 10 MT/Day |
Plant and Machinery cost: Rs 580 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.36 |
|
Break Even Point (BEP): 56.24 |
TCI : Cost of Project: Rs 1141 Lakhs |
|
Cost of Project : 114100000 |
Cement is an inorganic, non-metallic substance with hydraulic binding properties, and is used as a bonding agent in building materials. It is a fine p...
|
Capacity : Clinker for Cement: 100 MT/Day |
Plant and Machinery cost: Rs 436 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 23.00 |
|
Break Even Point (BEP): 55.00 |
TCI : Cost of Project: Rs 907 Lakhs |
|
Cost of Project : 90700000 |
Steel is a generic name for a group of ferrous metals which due to their abundance durability versatility and low cost are most useful metallic materi...
|
Capacity : TMT Bar: 125 MT/Day • Scraps: 6MT/Day |
Plant and Machinery cost: Rs 730 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 58.00 |
TCI : Cost of Project: Rs 1675 Lakhs |
|
Cost of Project : 167500000 |
Rice husk is an agricultural residue easily available in rice producing countries. India is a major rice producing country, and the husk generated dur...
|
Capacity : Precipitated Silica: 5 MT/Day,CaCO3 (by product):10.3 MT/Day |
Plant and Machinery cost: Rs 437 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 24.00 |
|
Break Even Point (BEP): 55.00 |
TCI : Cost of Project: Rs 660 Lakhs |
|
Cost of Project : 66000000 |
Plastic (HDPE, PVC, UPVC and RCC) Pipes [NPCS/4771/22821, 22826] PVC pipes are made out of a material known as polyvinyl chloride, a durable, stro...
|
Capacity : HDPE Pipes:83.3 MT/Day, PVC Pipes: 83.3 MT/Day |
Plant and Machinery cost: Rs 938 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 30.00 |
|
Break Even Point (BEP): 50.00 |
TCI : Cost of Project: Rs 2124 Lakhs |
|
Cost of Project : 212400000 |
SAW pipe is Submerged Arc Welded pipe. They are the pipes formed by the process called Submerged Arc welding. There can be two types of SAW pipes: 1....
|
Capacity : SAW (Spiral & Longitudinal) Pipes: 83.3 MT/Day |
Plant and Machinery cost: Rs 1387 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 11.00 |
|
Break Even Point (BEP): 57.00 |
TCI : Cost of Project: Rs 1802 Lakhs |
|
Cost of Project : 180200000 |
SAW pipe is Submerged Arc Welded pipe. They are the pipes formed by the process called Submerged Arc welding. There can be two types of SAW pipes: 1....
|
Capacity : SAW (Spiral & Longitudinal) Pipes: 166.7 MT/Day |
Plant and Machinery cost: Rs 1942 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 45.00 |
TCI : Cost of Project: Rs 3201 Lakhs |
|
Cost of Project : 320100000 |