The first group includes the following main resources:
Entrepreneurs can target high-potential sectors that align with Karnataka’s competitive advantages:
However, Karnataka typically provides the sectoral and region-specific facilitations as follows:
- Single-window clearance and industry facilitation agencies for approvals, land allotment;
- sectoral incentives (electronics, biotech, aerospace, EVs) like capital subsidies, interest reimbursement, GST/tax concessions in approved cases;
- industrial land and plug-and-play facilities via state industrial development authorities, and private industrial parks;
- R&D and incubation grants, testing labs, and skill-development partnerships to speed up tech commercialization.
That long innovation velocity of a leading global tech center mature, though mature manufacturing clusters and heartland rural agricultural zones like us.
A competitive advantage that is virtually a hybrid one which would involve both the intensive start-ups of knowledge as well as manufacturing/processing projects. Additionally and beside the above, there is technology, biotechnology, aerospace, electronics, green power, and agro-value addition as far as either of which go, some scaling options and supportive public-private even for those at the level of angel investors and keyword the entrepreneur ventures that are already favored.
Please choose a project below related to this category.
Controlled atmosphere (CA) storage involves maintaining an atmospheric composition that is different from air composition (about 78% N2, 21% O2, and 0...
|
Capacity : Seasonal Commodity:11 MT/Day,Cold Storage (Rental):44 MT/Day |
Plant and Machinery cost: Rs 365 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 19.00 |
|
Break Even Point (BEP): 45.00 |
TCI : Cost of Project: Rs 1022 Lakhs |
|
Cost of Project : 102200000 |
Fatty alcohol is a generic term for a range of aliphatic hydrocarbons containing a hydroxyl group, usually in the terminal or n-position.They are natu...
|
Capacity :
|
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Artificial leather is a fabric or finish intended to substitute for leather in fields such as upholstery, clothing, and fabrics, and other uses where...
|
Capacity : PU Leather Cloth:25000 Mtrs/Day,PVC Leather Cloth: 25000 Mtrs/Day |
Plant and Machinery cost: Rs 1338 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 43.00 |
TCI : Cost of Project: Rs 2780 Lakhs |
|
Cost of Project : 278000000 |
Superoxide dismutases (SOD, EC 1.15.1.1) are enzymes that alternately catalyze the dismutation (or partitioning) of the superoxide (O2?) radical into...
|
Capacity : Superoxide Dismutase: 50 Kgs/Day |
Plant and Machinery cost: Rs 133 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 46.00 |
TCI : Cost of Project: Rs 616 Lakhs |
|
Cost of Project : 61600000 |
The Indian pharmaceutical sector has come a long way, being almost non-existent before 1970 to a prominent provider of healthcare products, meeting al...
|
Capacity : Tablets: 500,000 Nos./Day,Capsules:500,000 Nos./Day,Syrup (100 ml Size):12,500 Nos./Day |
Plant and Machinery cost: Rs 178 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 31.00 |
|
Break Even Point (BEP): 32.00 |
TCI : Cost of Project: Rs 6342 Lakhs |
|
Cost of Project : 634200000 |
‘‘Cotton’ the white gold is one of the most important commercial; crops playing a key role in the economical, political and social affairs of the cou...
|
Capacity : Cotton Yarn: 24 MT/Day |
Plant and Machinery cost: Rs 4112 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 62.00 |
TCI : Cost of Project: Rs 5426 Lakhs |
|
Cost of Project : 542600000 |
A match is a small stick of wood or strip of cardboard with a solidified mixture of flammable chemicals deposited on one end. When that end is struck...
|
Capacity : Match Boxes: 1000 Cases/Day |
Plant and Machinery cost: Rs 229 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 59.00 |
TCI : Cost of Project: Rs 778 Lakhs |
|
Cost of Project : 77800000 |
In modern tobacco farming, Nicotiana seeds are scattered onto the surface of the soil, as their germination is activated by light, then covered in col...
|
Capacity : Processed Tobacco Leaves: 24 MT/Day |
Plant and Machinery cost: Rs 1265 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 24.00 |
|
Break Even Point (BEP): 80.00 |
TCI : Cost of Project: Rs 2267 Lakhs |
|
Cost of Project : 226700000 |
Carbon fibers have been under continuous development for the last 50 years. The properties of carbon fibers, such as high stiffness, high tensile stre...
|
Capacity : Carbon Fibre: 1000 Kgs/Day |
Plant and Machinery cost: Rs 173 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 57.00 |
TCI : Cost of Project: Rs 543 Lakhs |
|
Cost of Project : 54300000 |
Shrimps are swimming, decapod crustaceans classified in the infra order Caridea, found widely around the world in both fresh and salt water. Shrimps a...
|
Capacity : Shrimp: 1.4 MT/Day |
Plant and Machinery cost: Rs 895 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 12.00 |
|
Break Even Point (BEP): 40.00 |
TCI : Cost of Project: Rs 3409 Lakhs |
|
Cost of Project : 340900000 |
Collapsible tubes are very popular product and are made from tin sheet. Now, the tin sheet made collapsible tubes have been substituted by polythene c...
|
Capacity : Plastic Collapsible Tubes: 150,000 Nos./Day |
Plant and Machinery cost: Rs 138Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 52.00 |
TCI : Cost of Project: Rs 396 Lakhs |
|
Cost of Project : 39600000 |
Granite is a common type of felsic intrusive igneous rock which is granular and phaneritic in texture. These rocks mainly consist of feldspar, quartz,...
|
Capacity : Granite: 20 Cu.mt/Day |
Plant and Machinery cost: Rs 695 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 23.00 |
|
Break Even Point (BEP): 48.00 |
TCI : Cost of Project: Rs 1842 Lakhs |
|
Cost of Project : 184200000 |