The first group includes the following main resources:
Entrepreneurs can target high-potential sectors that align with Karnataka’s competitive advantages:
However, Karnataka typically provides the sectoral and region-specific facilitations as follows:
- Single-window clearance and industry facilitation agencies for approvals, land allotment;
- sectoral incentives (electronics, biotech, aerospace, EVs) like capital subsidies, interest reimbursement, GST/tax concessions in approved cases;
- industrial land and plug-and-play facilities via state industrial development authorities, and private industrial parks;
- R&D and incubation grants, testing labs, and skill-development partnerships to speed up tech commercialization.
That long innovation velocity of a leading global tech center mature, though mature manufacturing clusters and heartland rural agricultural zones like us.
A competitive advantage that is virtually a hybrid one which would involve both the intensive start-ups of knowledge as well as manufacturing/processing projects. Additionally and beside the above, there is technology, biotechnology, aerospace, electronics, green power, and agro-value addition as far as either of which go, some scaling options and supportive public-private even for those at the level of angel investors and keyword the entrepreneur ventures that are already favored.
Please choose a project below related to this category.
Sanitary Napkin comes under Nonwoven fabrics which as a whole come under technical textile. A sanitary napkin or a sanitary towel is an absorbent item...
|
Capacity : 30,000 Pkts./Day |
Plant and Machinery cost: Rs 345 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 42.00 |
TCI : Cost of Project: Rs 685 Lakhs |
|
Cost of Project : 68500000 |
Tractor is one of the most important farm machineries. We can say that tractor is the forehand of the farming industry. This is the blessing of god as...
|
Capacity : Tractors: 84 Nos./Day |
Plant and Machinery cost: Rs 258 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 35.00 |
|
Break Even Point (BEP): 51.00 |
TCI : Cost of Project: Rs 1771 Lakhs |
|
Cost of Project : 177100000 |
A transmission tower (colloquially termed an electricity pylon in the United Kingdom and parts of Europe, an ironman in Australia, and a hydro tower i...
|
Capacity : Transmission & Tele Communication Tower: 80 MT/ Day |
Plant and Machinery cost: Rs 239 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 46.00 |
TCI : Cost of Project: Rs 1309 Lakhs |
|
Cost of Project : 130900000 |
A lubricant is a substance introduced to reduce friction between moving surfaces. It may also have the function of transporting foreign particles. The...
|
Capacity : Blended Lubricating Oil 4 KL/ Day •Greases:1 KL/Day |
Plant and Machinery cost: Rs 174 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 52.00 |
TCI : Cost of Project: Rs 465 Lakhs |
|
Cost of Project : 46500000 |
Lime, magnesia, strontium, and baryts were found to have alkaline reactions and were called alkaline earths. The alkaline earth metal includes magnesi...
|
Capacity : Magnesium Sulphate (Fertiliser Grade): 60 MT/Day |
Plant and Machinery cost: Rs 195 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 62.00 |
|
Break Even Point (BEP): 48.00 |
TCI : Cost of Project: Rs 861 Lakhs |
|
Cost of Project : 86100000 |
An ‘Ore’ may be defined as the aggregate of minerals from which a desired constituent mineral can be extracted with profit. The most used of all metal...
|
Capacity : Iron Ore: 800 MT/Day |
Plant and Machinery cost: Rs 779 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 43.00 |
TCI : Cost of Project: Rs 2485 Lakhs |
|
Cost of Project : 2485 |
Bicycle tubes are the backbone of the bicycle industries. Few numbers of companies in organized sector are engaged in the quality grade cycles tyres a...
|
Capacity : Bicycle Tubes: 10,000 Nos. /Day |
Plant and Machinery cost: Rs 118 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 45.00 |
TCI : Cost of Project: Rs 622 Lakhs |
|
Cost of Project : 62200000 |
Autoclaved Aerated Concrete (AAC) is a non-combustible, lime-based, cementitious building material that is expanding into new worldwide markets. As a...
|
Capacity : A.A.C. Blocks: 500 Cu.Mt /day |
Plant and Machinery cost: Rs 601 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 50.00 |
TCI : Cost of Project:Rs 1415 Lakhs |
|
Cost of Project : 141500000 |
Edible nuts are used by mankind for food, edible oils, spices, condiments or beverages. They have been an important food source from prehistoric times...
|
Capacity : Pea Nuts:500 Kgs./Day • Cashew Nuts:500 Kgs./Day •Almonds:500 Kgs./Day •Pistachio:500 Kgs./Day |
Plant and Machinery cost: Rs 26 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 58.00 |
TCI : Cost of Project:: Rs 222 Lakhs |
|
Cost of Project : 22200000 |
Vodka is a neutral spirit that is without distinctive character, aroma, taste, or color. These properties are developed during the distillation proces...
|
Capacity : Vodka from Grain & Potato:30 KLs/Day |
Plant and Machinery cost: Rs 3845 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 41.00 |
TCI : Cost of Project: Rs 6316 Lakhs |
|
Cost of Project : 631600000 |
Banana is the common name for a type of fruit and also the herbaceous plants of the genus Musa. Banana is amongst the most versatile and most widely e...
|
Capacity : Banana Powder: 10 MT/Day |
Plant and Machinery cost: Rs 348 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 48.00 |
TCI : Cost of Project:Rs 975 Lakhs |
|
Cost of Project : 97500000 |
Most foods contain very high percentage of water. Microorganisms thrive when there is water, spoiling the food and altering its taste. Removing water...
|
Capacity : Freeze Dried Vegetables: 2MT/Day |
Plant and Machinery cost: Rs 242 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 66.00 |
TCI : Cost of Project: Rs 743 Lakhs |
|
Cost of Project : 74300000 |