The first group includes the following main resources:
Entrepreneurs can target high-potential sectors that align with Karnataka’s competitive advantages:
However, Karnataka typically provides the sectoral and region-specific facilitations as follows:
- Single-window clearance and industry facilitation agencies for approvals, land allotment;
- sectoral incentives (electronics, biotech, aerospace, EVs) like capital subsidies, interest reimbursement, GST/tax concessions in approved cases;
- industrial land and plug-and-play facilities via state industrial development authorities, and private industrial parks;
- R&D and incubation grants, testing labs, and skill-development partnerships to speed up tech commercialization.
That long innovation velocity of a leading global tech center mature, though mature manufacturing clusters and heartland rural agricultural zones like us.
A competitive advantage that is virtually a hybrid one which would involve both the intensive start-ups of knowledge as well as manufacturing/processing projects. Additionally and beside the above, there is technology, biotechnology, aerospace, electronics, green power, and agro-value addition as far as either of which go, some scaling options and supportive public-private even for those at the level of angel investors and keyword the entrepreneur ventures that are already favored.
Please choose a project below related to this category.
An adhesive is any substance applied to the surfaces of materials that binds them together and resists separation. The term "adhesive" may be used int...
|
Capacity : Contact Adhesive: 160 Kgs/Day |
Plant and Machinery cost: Rs 32 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 10.00 |
|
Break Even Point (BEP): 64.00 |
TCI : Cost of Project: Rs 220 Lakhs |
|
Cost of Project : 22000000 |
Paraffin wax is a white or colorless soft solid derivable from petroleum, coal or oil shale, that consists of a mixture of hydrocarbon molecules conta...
|
Capacity : Paraffin Wax:10 MT/Day •Micro Crystalline Wax (Bye Product):0.03 MT/Day •Foot Oil (Bye Product):2.51MT/Day |
Plant and Machinery cost: Rs 270 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 45.00 |
TCI : Cost of Project : Rs 922 Lakhs |
|
Cost of Project : 92200000 |
The betel nut (Supari) tree, which is known as "ARECA" in South India. It is planted in Bengal, Mysore, Sri Lanka etc. Its yield considered being very...
|
Capacity : - |
Plant and Machinery cost: Rs 9 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 45.00 |
TCI : Cost of Project : Rs 192 Lakhs |
|
Cost of Project : 19200000 |
Control of fertility continues to be an important issue through the world even though the population growth rate has shown a steady decline in many co...
|
Capacity : 116,666.7 Pcs /Day |
Plant and Machinery cost: Rs 139 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 53.00 |
TCI : Cost of Project : Rs 400 Lakhs |
|
Cost of Project : 40000000 |
Bitumen is defined as “A viscous liquid, or a solid, consisting essentially of hydrocarbons and their derivatives, which is soluble in trichloro-ethye...
|
Capacity : 50 MT/Day |
Plant and Machinery cost: Rs 143 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 54.00 |
TCI : Cost of Project :Rs 372 Lakhs |
|
Cost of Project : 37200000 |
Pickle is a general term used for fruits or vegetables preserved in vinegar or brine, usually with spices or sugar or both. Pickle producing businesse...
|
Capacity : - |
Plant and Machinery cost: Rs 65 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 31.00 |
|
Break Even Point (BEP): 48.00 |
TCI : Cost of Project : Rs 527 Lakhs |
|
Cost of Project : 52700000 |
Acetylene (C2H2) is known as one of the simplest and most significant chemical in the acetylene series. A compound of carbon and hydrogen, acetylene i...
|
Capacity : 360 M3/Day |
Plant and Machinery cost: Rs 68 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 52.00 |
TCI : Cost of Project : Rs 260 Lakhs |
|
Cost of Project : 26000000 |
Blood bag is a disposable bio-medical device used for collection, storage, transportation and transfusion of human blood and blood components. The sys...
|
Capacity : 30000 Nos./Day |
Plant and Machinery cost: Rs 426 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 48.00 |
TCI : Cost of Project: Rs 1465 Lakhs |
|
Cost of Project : 146500000 |
Barley Malt is germinated cereal grains that have been dried in a process known as "malting". The grains are made to germinate by soaking in water, an...
|
Capacity : 100MT/Day |
Plant and Machinery cost: Rs 408 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 43.00 |
TCI : Cost of Project : Rs 1672 Lakhs |
|
Cost of Project : 167200000 |
India is the largest producer of fruits and second largest producer of vegetables in the world. Fruits & vegetables, being perishable in nature requir...
|
Capacity : Cold Storage (Service On Rent): 5,000.0 Kgs./ Day•Ice Slab (120 Kgs each Ice Slab):40.0 Slab / Day |
Plant and Machinery cost: Rs 52 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project : Rs 243 Lakhs |
|
Cost of Project : 24300000 |
Technical textiles are defined as textile materials and products used primarily for their technical performance and functional properties rather than...
|
Capacity : 96000 Pcs/Day |
Plant and Machinery cost: Rs 76 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 45.00 |
TCI : Cost of Project : Rs 325 Lakhs |
|
Cost of Project : 32500000 |
Education is today identified among basic needs, as essential for an individual’s survival as ‘food, clothing and shelter.’ The need for education has...
|
Capacity : Total Students per Annum:750 Students/Annum |
Plant and Machinery cost: Rs 20 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 1.00 |
TCI : Cost of Project : Rs 578 Lakhs |
|
Cost of Project : 57800000 |