Please choose a project below related to this category.
Sponge iron is the product created when iron ore is reduced to metallic iron, usually with some kind of carbon (charcoal, etc), at temperatures below...
|
Capacity : 135000 MT / Annum |
Plant and Machinery cost: 7175 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 25.00 |
TCI : Cost of Project : 8923 Lakhs |
|
Cost of Project : 0 |
Iron oxides are extensively used in the preparation of paints. There are two main stains yellow and red. Both these varieties are available in synthe...
|
Capacity : 5 MT/ Day |
Plant and Machinery cost: 80 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 42.00 |
TCI : 4 Crores |
|
Cost of Project : 0 |
Disposable needle is widely used by doctors for injection purpose with the help of syringes. With the increase in population in our country, requirem...
|
Capacity : - |
Plant and Machinery cost: 147 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 47.00 |
TCI : Cost of Project : 426 Lakhs |
|
Cost of Project : 0 |
Broadly speaking a fertilizer or manure, may be interpreted to mean anything that will increase the yield of a crop is added to the soil. Generally...
|
Capacity : 20 Ton / Day |
Plant and Machinery cost: 100 Lakh |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 38.00 |
TCI : 468 Lakh |
|
Cost of Project : 0 |
There are various processes by which metal can be shaped such as forging, extrusions, pressing, welding, rolling and costing. Among the various proce...
|
Capacity : 18000 MT / Annum |
Plant and Machinery cost: 173 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 64.00 |
TCI : Cost of Project : 499 Lakhs |
|
Cost of Project : 0 |
Chromium is the 21st most abundant metal in the Earths crust. The only commercial ore of chromium is the chromite. Most chromite ores are rich enough...
|
Capacity : 30,000 MT/ Annum each ores |
Plant and Machinery cost: 896 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 49.00 |
TCI : Cost of Project : 3528 Lakhs |
|
Cost of Project : 0 |
Iron ore pellets are used in blast furnaces for producing sponge iron & steels. Marked by high productivity lower fuel consumption and improved furnac...
|
Capacity : 6000 MT / Annum |
Plant and Machinery cost: 187 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 46.00 |
TCI : Cost of Project : 479 Lakhs |
|
Cost of Project : 0 |
Carpentry and joinery are common terms used with any class of work with wood. Strictly speaking carpentry deals with all works of a carpentry such as...
|
Capacity : 80 Pcs./day |
Plant and Machinery cost: 10 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 50.00 |
|
Break Even Point (BEP): 42.00 |
TCI : 93 Lakhs |
|
Cost of Project : 0 |
The Pharmaceutical Industry in general is well managed in sound economic principles and has excellent techniques of production, technological backing...
|
Capacity : - |
Plant and Machinery cost: 43 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 54.00 |
TCI : Cost of Project : 125 Lakhs |
|
Cost of Project : 0 |
For a building being constructed the one and only thing which is to be considered is its strength of bearing load of both environmental artificial. Bu...
|
Capacity : 3000 MT / Annum |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 54.00 |
TCI : - |
|
Cost of Project : 0 |
Castings of suitable shape and size intended for subsequent hot working are termed as ingots. Ingot iron has very low carbon in steel. This is general...
|
Capacity : 60,000 MT / Annum |
Plant and Machinery cost: 4012 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 30.00 |
TCI : 6454 Lakhs |
|
Cost of Project : 0 |
There are various processes by which metal can be shaped such as forging, extrusions, pressing, welding, rolling and casting. Among the various proce...
|
Capacity : 18,000 MT/Annum |
Plant and Machinery cost: Rs. 168 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 66.00 |
TCI : Cost of Project Rs. 483 Lakhs |
|
Cost of Project : 0 |