Please choose a project below related to this category.
Low Carbon Silico Manganese which is popularly known as LCSiMn is a ferrous alloy with content of carbon, silica and manganese. A large number of stee...
|
Capacity : Low Carbon Silicomanganese: 15,000 MT/Annum |
Plant and Machinery cost: Rs 1422 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 55.00 |
TCI : Cost of Project : Rs 3936 lakhs |
|
Cost of Project : 393600000 |
High Carbon Ferro- manganese containing about 7% carbon is not suitable for the production of steels or other alloys containing manganese in which it...
|
Capacity : Low Carbon Ferromanganes : 15,000 MT/Annum |
Plant and Machinery cost: Rs 371 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 61.00 |
TCI : Cost of Project : Rs 2804 lakhs |
|
Cost of Project : 280400000 |
Copper makes vital contributions to sustaining and improving society. Copper's chemical, physical and aesthetic propertiesmake it a materialof choice...
|
Capacity : Copper Powder : 15,000 MT/Annum |
Plant and Machinery cost: Rs 307 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 31.00 |
|
Break Even Point (BEP): 46.00 |
TCI : Cost of Project: Rs3050 lakhs |
|
Cost of Project : 305000000 |
Manganese is a key component in the production of steel. Although classified as a minor metal, the quantity of manganese produced worldwide each year...
|
Capacity : Manganese Metal: 15,000 MT/Annum |
Plant and Machinery cost: Rs 663 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 43.00 |
TCI : Cost of Project : Rs 2553 lakhs |
|
Cost of Project : 255300000 |
Dairy farming has been part of agriculture for thousands of years, but historically, it was usually done on a small scale on mixed farms.But today, In...
|
Capacity : Cow Milk: 345,600 Kgs/Annum Buffalo Milk: 207,360Kgs/Annum Cattle Dung Manure: 1,080,000/Annum |
Plant and Machinery cost: Rs 46 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 12.00 |
|
Break Even Point (BEP): 74.00 |
TCI : Cost of Project: Rs 282 lakhs |
|
Cost of Project : 28200000 |
Dairy farming has been part of agriculture for thousands of years, but historically, it was usually done on a small scale on mixed farms.But today, In...
|
Capacity : Milk: 1,800,000 Ltrs/Annum Curd : 360,000 Ltrs /Annum Butter Milk: 345,600 Ltrs /Annum Cheese: 36,000 kg /Annum Ghee: 14,400 |
Plant and Machinery cost: Rs. 581 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 43.00 |
TCI : Cost of Project : Rs. 2047 lakhs |
|
Cost of Project : 204700000 |
Engineered stone is a composite material made of crushed stone bound together by an adhesive, (most commonly polymer resin, with some newer versions u...
|
Capacity : Quartz Slabs (760 x 2440 x 15 mm):60 Nos/Day |
Plant and Machinery cost: Rs 101 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.58 |
|
Break Even Point (BEP): 51.79 |
TCI : Cost of Project : Rs 350 Lakhs |
|
Cost of Project : 35000000 |
Hematite is one of the most abundant minerals on Earth's surface and in the shallow crust. It is an iron oxide with a chemical composition of Fe2O3. I...
|
Capacity : Hematite:120 MT/Day |
Plant and Machinery cost: Rs 416 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.11 |
|
Break Even Point (BEP): 51.00 |
TCI : Cost of Project : Rs 1081 Lakhs |
|
Cost of Project : 108100000 |
The principal feed resources for animal consumption in the country are crop residues like straws of wheat, rice and other cereals and stovers, which a...
|
Capacity : 100 MT/Day |
Plant and Machinery cost: Rs 115 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.19 |
|
Break Even Point (BEP): 53.57 |
TCI : Cost of Project:Rs 660 Lakhs |
|
Cost of Project : 6600000 |
Copper makes vital contributions to sustaining and improving society. Copper's chemical, physical and aesthetic properties make it a material of choic...
|
Capacity : Copper Powder:3.33 MT/Day |
Plant and Machinery cost: Rs 46 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.33 |
|
Break Even Point (BEP): 63.22 |
TCI : Cost of Project:Rs 321 Lakhs |
|
Cost of Project : 32100000 |
Bleaching earth consists primarily of hydrous aluminium silicates (clay minerals) of varying composition. Common components are montmorillonite, kaoli...
|
Capacity : 20MT/Day |
Plant and Machinery cost: Rs 72 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.38 |
|
Break Even Point (BEP): 44.37 |
TCI : Cost of Project:Rs 712 Lakhs |
|
Cost of Project : 71200000 |
Tomatoes are the most popular vegetable in the home garden. Tomatoes are widely grown in all parts of the world. They are available in a variety of si...
|
Capacity : 12 MT/Day |
Plant and Machinery cost: Rs 56 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.84 |
|
Break Even Point (BEP): 65.99 |
TCI : Cost of Project:Rs 360 Lakhs |
|
Cost of Project : 36000000 |