India is an agricultural country and livestock sector is an integral part of agriculture. Dairy farming from being traditional family run businesses t...
|
Capacity : 25,20,000 LTS/Annum |
Plant and Machinery cost: Rs. 239 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 34.00 |
|
Break Even Point (BEP): 39.00 |
TCI : Cost of Project: Rs 605 Lakhs |
|
Cost of Project : 60500000 |
Maize is one of the cereal grains which has been produced throughout India and is placed 3rd position in agricultural base production. Karnataka, AP,...
|
Capacity : 60,900 MT/Annum |
Plant and Machinery cost: Rs. 420 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 59.00 |
TCI : Cost of Project: Rs 1229 Lakhs |
|
Cost of Project : 122900000 |
In India dairying has been practiced as a rural cottage industry since the remote past. Semi commercial dairying started with the establishment of mil...
|
Capacity : 25,20,000 LTS/Annum |
Plant and Machinery cost: Rs. 239 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 34.00 |
|
Break Even Point (BEP): 39.00 |
TCI : Cost of Project: Rs 605 Lakhs |
|
Cost of Project : 60500000 |
Maize is one of the cereal grains which has been produced throughout India and is placed 3rd position in agricultural base production. Maize is consti...
|
Capacity : 60,900 MT/Annum |
Plant and Machinery cost: Rs. 420 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 59.00 |
TCI : Cost of Project: Rs 1229 Lakhs |
|
Cost of Project : 122900000 |
Fasteners have played a major role in the advancement of the human race since prehistoric days when the caveman used thongs to hold a rock into the sp...
|
Capacity : 600 MT/Annum |
Plant and Machinery cost: Rs. 207 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 54.00 |
TCI : Cost of Project: Rs 441 Lakhs |
|
Cost of Project : 44100000 |
Potato is widely consumed as food all over the world. It contains the starch as a major carbohydrate. Surplus and cull potatoes are used as feed for l...
|
Capacity : 4500 MT/Annum |
Plant and Machinery cost: Rs. 517 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 47.00 |
TCI : Cost of Project: Rs 899 Lakhs |
|
Cost of Project : 89900000 |
Copper (II) Sulfate is a chemical compound with the formula CuSO4. It occurs in nature as mineral hydrocyanite. It is gray to white and has rhombic cr...
|
Capacity : 600 Nos. /annum |
Plant and Machinery cost: 43 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 24.00 |
|
Break Even Point (BEP): 60.00 |
TCI : Cost of Project: 238 Lakhs |
|
Cost of Project : 23800000 |
The principal feed resources for animal consumption in the country are crop residues like straws of wheat, rice and other cereals and stovers, which a...
|
Capacity : 14400 MT/annum |
Plant and Machinery cost: Rs. 23 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 30.00 |
|
Break Even Point (BEP): 66.00 |
TCI : Cost of Project: Rs. 202 Lakhs |
|
Cost of Project : 20200000 |
Ferroalloys have been developed to improve the properties of steels and alloys by introducing specific alloying elements in desirable quantities in th...
|
Capacity : 36000 MT/annum |
Plant and Machinery cost: Rs. 6457 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 24.00 |
|
Break Even Point (BEP): 51.00 |
TCI : Cost of Project: Rs. 16549 Lakhs |
|
Cost of Project : 1654900000 |
In igneous rocks, which comprise 95% of the earth’s crust the average percentage concentration of manganous oxide is 0.124. This is small in compared...
|
Capacity : 10 MT/Day. |
Plant and Machinery cost: 256 Lakhs. |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 65.00 |
TCI : Cost of Project:691 Lakhs. |
|
Cost of Project : 69100000 |
GI Pipes/ Galvanized pipes are steel pipes covered with a protective coating of zinc that greatly reduces its tendency to corrode and extends its life...
|
Capacity : 60 MT/Day. |
Plant and Machinery cost: Rs.701 Lakhs. |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 40.00 |
TCI : Cost of Project:Rs.2462 Lakhs. |
|
Cost of Project : 246200000 |
Steel is a generic name for a group of ferrous metals which due to their abundance durability versatility and low cost are most useful metallic materi...
|
Capacity : 100 MT/Day |
Plant and Machinery cost: Rs.255 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 51.00 |
|
Break Even Point (BEP): 33.00 |
TCI : Rs.3699 Lakhs. |
|
Cost of Project : 0 |