Please choose a project below related to this category.
Ferro manganese are alloys composed of iron and one or two more metals like Mn, Si, Ti, W etc. The ferro alloys have usually lower melting points than...
|
Capacity : Ferro Silicon:59.0 MT/Day.,Ferro Manganese:167.0 MT/Day.,Silico Manganese:130.5 MT/Day. |
Plant and Machinery cost: Rs.2493 Lakhs. |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 41.00 |
TCI : Cost of Project :Rs4280 Lakhs. |
|
Cost of Project : 428000000 |
Titanium is relatively abundant in the earth’s crust, which is usually found in igneous and metamorphic rocks as ilmenite (FeTiO3), rutile (TiO2) and...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Stainless Steel is a common name for metal alloys that consist of 10.5% or more Chromium (Cr) and more than 50% Iron (Fe). Although it is called stain...
|
Capacity : 10 MT/Day |
Plant and Machinery cost: Rs.1148 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 19.00 |
|
Break Even Point (BEP): 38.00 |
TCI : Cost Of Project : Rs. 3194 Lakhs |
|
Cost of Project : 319400000 |
Pre gelatinized starch is a processed carbohydrate used as a texturizer and or binder. It is typically derived from corn, waxy corn potato or tapioca....
|
Capacity : 10 MT/Day |
Plant and Machinery cost: Rs.93 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 59.00 |
TCI : Cost Of Project : Rs. 475 Lakhs |
|
Cost of Project : 47500000 |
Mild steel is the least expensive of all steel and the most common steel used. Used in nearly every type of product created from steel, it is weldabl...
|
Capacity : MS TMT Bar: 333 MT/Day,MS Round Bar: 333 MT/Day,MS Flat:333 MT/Day |
Plant and Machinery cost: 3380 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 38.00 |
|
Break Even Point (BEP): 57.00 |
TCI : Cost Of Project : Rs.8580 Lakhs |
|
Cost of Project : 858000000 |
Galvanized Corrugated Sheets are manufactured using best grade steel and is widely applied in construction industry. Galvanized Corrugated Sheets have...
|
Capacity : 500 Nos./ day |
Plant and Machinery cost: Rs.12 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 39.00 |
|
Break Even Point (BEP): 59.00 |
TCI : Cost Of Project : Rs.165 Lakhs |
|
Cost of Project : 16500000 |
Starch (C6H10O5)n, the principal reserve poly Saccharide in plants constitutes substantial portion of human diet. It is the principal components of mo...
|
Capacity : 80 MT/day |
Plant and Machinery cost: Rs.358 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 36.00 |
|
Break Even Point (BEP): 45.00 |
TCI : Cost of Project : Rs.737 Lakhs |
|
Cost of Project : 73700000 |
A sewing machine needle consists of shank clamped by the sewing machines needle holder shoulder where the thick shank tapers down to the shaft a...
|
Capacity : 200000 Pcs/Day |
Plant and Machinery cost: Rs.109 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 33.00 |
|
Break Even Point (BEP): 49.00 |
TCI : Cost of Project : Rs.342 Lakhs |
|
Cost of Project : 34200000 |
Products, such as tomato paste/puree have potential demand with local fruit/vegetable processors as well as the retail market. Establishment of tomato...
|
Capacity : 75000 Pouches/Day (70 gms, 100 gms & 200 gms) |
Plant and Machinery cost: Rs.26 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 52.00 |
|
Break Even Point (BEP): 28.00 |
TCI : Rs.599 Lakhs |
|
Cost of Project : 0 |
Nuts and Bolts are most commonly used items in the family of industrial fasteners and their demand is fast increasing due to expansion of industries i...
|
Capacity : 30 MT/Day |
Plant and Machinery cost: Rs.292 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 34.00 |
|
Break Even Point (BEP): 55.00 |
TCI : Cost of Project : Rs.674 Lakhs |
|
Cost of Project : 67400000 |
Sorbitol is one of many sugar alcohols found in nature that gets metabolized slower in our bodies than other normal dietary sugars. Also known as gluc...
|
Capacity : 47 MT/Day |
Plant and Machinery cost: Rs. 869 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 41.00 |
TCI : Cost of Project : Rs. 1235 Lakhs |
|
Cost of Project : 123500000 |
Maize is third important cereal/crop after wheat and rice and has a great potential of processing due to its high nutritive value and commercial uses....
|
Capacity : - |
Plant and Machinery cost: Rs.1029 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 52.00 |
|
Break Even Point (BEP): 30.00 |
TCI : Cost of Project : Rs.2807 Lakhs |
|
Cost of Project : 280700000 |