Please choose a project below related to this category.
Sizing Precipitated Calcium Carbonate (PCC)—also known as purified, refined or synthetic calcium carbonate. It has the same chemical formula as other...
|
Capacity : 25 MT/Day |
Plant and Machinery cost: Rs 715 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 20.65 |
|
Break Even Point (BEP): 52.58 |
TCI : Cost of Project: Rs 1138 Lakhs |
|
Cost of Project : 113800000 |
The principal feed resources for animal consumption in the country are crop residues like straws of wheat, rice and other cereals and stovers, which a...
|
Capacity : 100 MT/Day |
Plant and Machinery cost: Rs 277 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.22 |
|
Break Even Point (BEP): 48.23 |
TCI : Cost of Project: Rs 869 Lakhs |
|
Cost of Project : 86900000 |
A restaurant is simply a place to have food outside your home. It is smaller in size than a hotel as it does not have accommodation facilities. It is...
|
Capacity : Restaurant (Veg. - Non-Veg.): 150 Nos/Day, Beer: 330 Pitchers/Day, Alcohol : 100 Nos/Day, Fresh Fruit Juice: 500 Nos/Day |
Plant and Machinery cost: Rs 189 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.28 |
|
Break Even Point (BEP): 63.08 |
TCI : Cost of Project: Rs 392 Lakhs |
|
Cost of Project : 39200000 |
Ferro Alloys Plays major role in Steel Production and industrial development. Ferro-alloys are iron based alloys with varied elements introduced in st...
|
Capacity : Ferro Silicon: 100 MT/Day |
Plant and Machinery cost: Rs 7566 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 43.00 |
TCI : Cost of Project: Rs 10793 Lakhs |
|
Cost of Project : 1079300000 |
Glucose is a monosaccharide (or simple sugar) also known as grape sugar, blood sugar, or corn sugar, is a very important carbohydrate in biology. The...
|
Capacity : Glucose 60 MT/Day,Sorbitol40 MT/Day, Maize Oil 12 MT/Day |
Plant and Machinery cost: Rs 5405 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 46.00 |
TCI : Cost of Project: Rs 7732 Lakhs |
|
Cost of Project : 773200000 |
Maize and its By Products (Maize Starch, Modified Starches & Animal Feed) Corn starch, corn flour or maize starch is the starch derived from the c...
|
Capacity : Maize Starch : 37.50 MT/day•Modified Starch : 45 MT/day•Animal Feed:45 MT/day |
Plant and Machinery cost: Rs 1105 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 45.00 |
TCI : Cost of Project : Rs 2894 Lakhs |
|
Cost of Project : 289400000 |
The production of poultry throughout the world is carried out by a highly specialized, efficient poultry industry that has been a leader in trends of...
|
Capacity : Broilers : 400 Nos/Day,Eggs :600 Nos/Day |
Plant and Machinery cost: Rs 22 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 12.00 |
|
Break Even Point (BEP): 60.00 |
TCI : Cost of Project : Rs 103 Lakhs |
|
Cost of Project : 10300000 |
Poultry feed is needed to produce poultry, a substantial part of the food industry. Feeds are used as edible materials, which are consumed poultry and...
|
Capacity : 72000 MT/ Annum |
Plant and Machinery cost: Rs. 294 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project: Rs. 1167 Lakhs |
|
Cost of Project : 116700000 |
In India the animal feed industry is of recent origin, the first animal food plant having been established in 1960. There are today as many as 14 plan...
|
Capacity : 15000 MT/ Annum |
Plant and Machinery cost: Rs. 160 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 57.00 |
TCI : Cost of Project : Rs. 405 Lakhs |
|
Cost of Project : 40500000 |
Copper is mankind’s oldest metal, dating back some 10,000 years. All of the great civilizations of the past used copper and copper alloys (principally...
|
Capacity : Copper Ingot: 8 MT/Day, Copper Rod: 36 MT/Day, Copper Wire: 4 MT/Day |
Plant and Machinery cost: Rs. 278 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 62.00 |
|
Break Even Point (BEP): 54.00 |
TCI : Cost of Project : Rs. 1201 Lakhs |
|
Cost of Project : 120100000 |
Steel is a generic name for a group of ferrous metals which due to their abundance durability versatility and low cost are most useful metallic materi...
|
Capacity : 30000 MT /Annum |
Plant and Machinery cost: Rs. 277 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 69.00 |
|
Break Even Point (BEP): 25.00 |
TCI : Cost of Project : Rs. 857 Lakhs |
|
Cost of Project : 85700000 |
Tomatoes are the most popular vegetable in the home garden. Tomatoes are widely grown in all parts of the world. They are available in a variety of si...
|
Capacity : 225 Lakh Pouches/Annum |
Plant and Machinery cost: Rs. 33 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 47.00 |
TCI : Cost of Project : Rs. 308 Lakhs |
|
Cost of Project : 30800000 |