Gypsum board, also known as drywall or plaster board, consists of a core of gypsum surrounded with a paper covering. Several varieties of gypsum board...
|
Capacity : 6600 No.s/day |
Plant and Machinery cost: 192 Lakh |
|
Working Capital : - |
Rate of Return (ROR): 26.11 |
|
Break Even Point (BEP): 61.30 |
TCI : Cost of Project : 551 lakh |
|
Cost of Project : 55100000 |
Poultry and poultry products constitutes an important component of human diet in most of the countries of the world. This consumption is also increasi...
|
Capacity : 1390 Nos/day |
Plant and Machinery cost: 18 Lakh |
|
Working Capital : - |
Rate of Return (ROR): 30.71 |
|
Break Even Point (BEP): 35.14 |
TCI : Cost of Project : 3037 lakh |
|
Cost of Project : 303700000 |
A transmission tower (colloquially termed an electricity pylon in the United Kingdom and parts of Europe, an ironman in Australia, and a hydro tower i...
|
Capacity : 144 MT /day |
Plant and Machinery cost: 11576 Lakh |
|
Working Capital : - |
Rate of Return (ROR): 22.45 |
|
Break Even Point (BEP): 42.26 |
TCI : Cost of Project : 15505 lakh |
|
Cost of Project : 1550500000 |
Profile Electric Resistance Welded Pipe that is also known as ERW pipe and it is made of strips of steel that is hot rolled and passed through formin...
|
Capacity : 12 MT/Day |
Plant and Machinery cost: 172 Lakh |
|
Working Capital : - |
Rate of Return (ROR): 36.00 |
|
Break Even Point (BEP): 53.00 |
TCI : Cost of Project : 416 Lakh |
|
Cost of Project : 41600000 |
Profile Copper powder is finely granulated copper that has many metallurgic functions. The powder is cheaper than regular cast copper, so engineers c...
|
Capacity : 2 MT/ day |
Plant and Machinery cost: 27 Lakh |
|
Working Capital : - |
Rate of Return (ROR): 50.00 |
|
Break Even Point (BEP): 29.70 |
TCI : 792 Lakh |
|
Cost of Project : 0 |
Profile Goat and sheep rearing is the backbone of economy of small and landless farmers in India. It is an insurance against crop failure and provide...
|
Capacity : Goats: 500 Male & 500 Female Sheep: 500 Male & 500 Female |
Plant and Machinery cost: 11 Lakh |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 34.00 |
TCI : 209 Lakh |
|
Cost of Project : 0 |
Profile Maize is one of the cereal grains which produces throughout India and is placed 3rd position in agricultural base production. The products fr...
|
Capacity : - |
Plant and Machinery cost: 216 Lakh |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 57.00 |
TCI : Cost of the Project : 630 Lakh |
|
Cost of Project : 63000000 |
Profile Rolling allows sheet metal to be formed in to cylindrical shapes. This gives us the ability to make tanks, cylinders, bands and virtually any...
|
Capacity : 9000 MT SS Rolled Sheet/Annum,4500000 No.s of Set SS Utensils/Annum |
Plant and Machinery cost: 3642 Lakh |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 49.00 |
TCI : Cost of Project : 6391 Lakh |
|
Cost of Project : 639100000 |
Profile Goat is one of the world’s smallest domesticated livestock, have been actively managed for food and fiber earlier and longer than cattle and...
|
Capacity : 1000 Goats |
Plant and Machinery cost: 6 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 47.00 |
|
Break Even Point (BEP): 33.00 |
TCI : 115 Lakhs |
|
Cost of Project : 0 |
Profile Maize is third important cereal/crop after wheat and rice and has a great potential of processing due to its high nutritive value and commerc...
|
Capacity : - |
Plant and Machinery cost: 2531 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 44.00 |
TCI : Cost of project : 4639 Lakhs |
|
Cost of Project : 463900000 |
Profile: The lead-acid storage battery, an important energy storage device, is the most widely used secondary storage cell by automobile and other in...
|
Capacity : 300000 Nos./Annum |
Plant and Machinery cost: 416 Lakhs |
|
Working Capital : |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of project : 1327 Lakhs |
|
Cost of Project : 132700000 |
Profile: A fastener is a hardware device that mechanically joins or affixes two or more objects together. Fasteners mainly cover nuts, bolts, screws,...
|
Capacity : 2400 MT/Annum |
Plant and Machinery cost: 120 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 59.00 |
TCI : Cost of project: 417 Lakhs |
|
Cost of Project : 41700000 |