Please choose a project below related to this category.
Maize (Zea mays) is classified into dent, flint, waxy, sweet and pop corn categories. Dent corn also known as field corn, containing both hard and so...
|
Capacity : - |
Plant and Machinery cost: Rs.145 Crores |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 31.00 |
TCI : Cost of Project : Rs.213 Crores |
|
Cost of Project : 2130000000 |
Most of the old Cast Iron pipes are cast vertically but this type has been largely superseded by spun iron type manufactured up to a diameter of 900...
|
Capacity : 2000 NOS./Day |
Plant and Machinery cost: 371 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 24.00 |
|
Break Even Point (BEP): 45.00 |
TCI : 1572 Lakhs |
|
Cost of Project : 0 |
Tomatoes are the most popular vegetable in the home garden. Tomatoes are widely grown in all parts of the world. They are available in a variety of si...
|
Capacity : 20 MT/Day |
Plant and Machinery cost: 80 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 49.00 |
|
Break Even Point (BEP): 33.00 |
TCI : 1008 Lakhs |
|
Cost of Project : 0 |
Lead acid batteries are rechargeable batteries made of lead plates situated in a ‘bath’ of sulfuric acid within a plastic casing. They are used in eve...
|
Capacity : 40 MT/Day |
Plant and Machinery cost: 316 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 32.00 |
|
Break Even Point (BEP): 50.00 |
TCI : Cost of Project : 696 Lakhs |
|
Cost of Project : 0 |
Magnesium oxide is the most important industrial magnesium compound with its main application in the steel and refractory industry. It is also largely...
|
Capacity : 1000 MT/Day |
Plant and Machinery cost: Rs.6105 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 47.00 |
|
Break Even Point (BEP): 75.00 |
TCI : Cost of Project : Rs.10189 Lakhs |
|
Cost of Project : 1018900000 |
Maize is one of the cereal grains which produces through out India and is placed 3rd position in agricultural base production. Maize is constituted by...
|
Capacity : - |
Plant and Machinery cost: 349 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 57.00 |
|
Break Even Point (BEP): 60.00 |
TCI : Cost of Project : 1137 Lakhs |
|
Cost of Project : 113700000 |
A transmission tower (colloquially termed an electricity pylon in the United Kingdom and parts of Europe, an ironman in Australia, and a hydro tower i...
|
Capacity : 24000 Mt/ Annum |
Plant and Machinery cost: 163 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 43.00 |
TCI : Cost of Project : 833 Lakhs |
|
Cost of Project : 83300000 |
Marble is a non-foliated metamorphic rock composed of recrystallized carbonate minerals, most commonly calcite or dolomite. Geologists use the term ma...
|
Capacity : -- |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 1.00 |
TCI : - |
|
Cost of Project : 0 |
EMD is a complex composite of various crystals of manganese and oxygen that is produced through electro-winning. It is used primarily as the active co...
|
Capacity : Electrolytic Manganese Dioxide 5 MT Per Day |
Plant and Machinery cost: 89 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 57.00 |
TCI : Cost of Project: 576 Lakhs |
|
Cost of Project : 57600000 |
The quail is a small bird that inhabits woodland and forest areas around the world. There are thought to be more than 15 different species of quail, w...
|
Capacity : 11 Flocks per year (@40,000 Birds per Flock) |
Plant and Machinery cost: 4.5 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 47.00 |
|
Break Even Point (BEP): 0.00 |
TCI : 34 Lakhs |
|
Cost of Project : 0 |
EMU (Dromaius novaehollandiae) and ostrich (Struthio camelus) birds belong to ratite group have high economic value for their meat, eggs, oil, skin an...
|
Capacity : 2 Lakh Pairs/Annum |
Plant and Machinery cost: 49 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.45 |
|
Break Even Point (BEP): 34.74 |
TCI : 617 Lakhs |
|
Cost of Project : 0 |
Electric Resistance Welded Pipe that is also known as ERW pipe and it is made of strips of steel that is hot rolled and passed through forming rolls a...
|
Capacity : 180000/annum |
Plant and Machinery cost: 838 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 67.25 |
|
Break Even Point (BEP): 31.83 |
TCI : Cost of Project : 3044 Lakhs |
|
Cost of Project : 304400000 |