Please choose a project below related to this category.
Maize is one of the cereal grains which produces through out India and is placed 3rd position in agricultural base production. Maize is constituted by...
|
Capacity : - |
Plant and Machinery cost: 349 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 57.00 |
|
Break Even Point (BEP): 60.00 |
TCI : Cost of Project : 1137 Lakhs |
|
Cost of Project : 113700000 |
A transmission tower (colloquially termed an electricity pylon in the United Kingdom and parts of Europe, an ironman in Australia, and a hydro tower i...
|
Capacity : 24000 Mt/ Annum |
Plant and Machinery cost: 163 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 43.00 |
TCI : Cost of Project : 833 Lakhs |
|
Cost of Project : 83300000 |
Marble is a non-foliated metamorphic rock composed of recrystallized carbonate minerals, most commonly calcite or dolomite. Geologists use the term ma...
|
Capacity : -- |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 1.00 |
TCI : - |
|
Cost of Project : 0 |
EMD is a complex composite of various crystals of manganese and oxygen that is produced through electro-winning. It is used primarily as the active co...
|
Capacity : Electrolytic Manganese Dioxide 5 MT Per Day |
Plant and Machinery cost: 89 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 57.00 |
TCI : Cost of Project: 576 Lakhs |
|
Cost of Project : 57600000 |
The quail is a small bird that inhabits woodland and forest areas around the world. There are thought to be more than 15 different species of quail, w...
|
Capacity : 11 Flocks per year (@40,000 Birds per Flock) |
Plant and Machinery cost: 4.5 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 47.00 |
|
Break Even Point (BEP): 0.00 |
TCI : 34 Lakhs |
|
Cost of Project : 0 |
EMU (Dromaius novaehollandiae) and ostrich (Struthio camelus) birds belong to ratite group have high economic value for their meat, eggs, oil, skin an...
|
Capacity : 2 Lakh Pairs/Annum |
Plant and Machinery cost: 49 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.45 |
|
Break Even Point (BEP): 34.74 |
TCI : 617 Lakhs |
|
Cost of Project : 0 |
Electric Resistance Welded Pipe that is also known as ERW pipe and it is made of strips of steel that is hot rolled and passed through forming rolls a...
|
Capacity : 180000/annum |
Plant and Machinery cost: 838 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 67.25 |
|
Break Even Point (BEP): 31.83 |
TCI : Cost of Project : 3044 Lakhs |
|
Cost of Project : 304400000 |
Gypsum board, also known as drywall or plaster board, consists of a core of gypsum surrounded with a paper covering. Several varieties of gypsum board...
|
Capacity : 6600 No.s/day |
Plant and Machinery cost: 192 Lakh |
|
Working Capital : - |
Rate of Return (ROR): 26.11 |
|
Break Even Point (BEP): 61.30 |
TCI : Cost of Project : 551 lakh |
|
Cost of Project : 55100000 |
Poultry and poultry products constitutes an important component of human diet in most of the countries of the world. This consumption is also increasi...
|
Capacity : 1390 Nos/day |
Plant and Machinery cost: 18 Lakh |
|
Working Capital : - |
Rate of Return (ROR): 30.71 |
|
Break Even Point (BEP): 35.14 |
TCI : Cost of Project : 3037 lakh |
|
Cost of Project : 303700000 |
A transmission tower (colloquially termed an electricity pylon in the United Kingdom and parts of Europe, an ironman in Australia, and a hydro tower i...
|
Capacity : 144 MT /day |
Plant and Machinery cost: 11576 Lakh |
|
Working Capital : - |
Rate of Return (ROR): 22.45 |
|
Break Even Point (BEP): 42.26 |
TCI : Cost of Project : 15505 lakh |
|
Cost of Project : 1550500000 |
Profile Electric Resistance Welded Pipe that is also known as ERW pipe and it is made of strips of steel that is hot rolled and passed through formin...
|
Capacity : 12 MT/Day |
Plant and Machinery cost: 172 Lakh |
|
Working Capital : - |
Rate of Return (ROR): 36.00 |
|
Break Even Point (BEP): 53.00 |
TCI : Cost of Project : 416 Lakh |
|
Cost of Project : 41600000 |
Profile Copper powder is finely granulated copper that has many metallurgic functions. The powder is cheaper than regular cast copper, so engineers c...
|
Capacity : 2 MT/ day |
Plant and Machinery cost: 27 Lakh |
|
Working Capital : - |
Rate of Return (ROR): 50.00 |
|
Break Even Point (BEP): 29.70 |
TCI : 792 Lakh |
|
Cost of Project : 0 |