The primary objective of the study is to review the technological status of ferroalloys industry in the country in the area of bulk production of sil...
|
Capacity : 12 MT/Day, Ferro Manganese –6 MT/Day, Silico Manganese 3 MT/Day, Ferro Silicon 3 MT/Day |
Plant and Machinery cost: 75 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 36.00 |
|
Break Even Point (BEP): 79.00 |
TCI : Cost of Project : 242 Lakhs |
|
Cost of Project : 0 |
Most bacteria, yeasts and molds are difficult to remove from food surfaces. Washing fresh food reduces their numbers only slightly. Peeling root crops...
|
Capacity : 12000 Cans/Day(Chopped Tomatoes, Cheeked Beans, Mushrooms) |
Plant and Machinery cost: 67 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 32.00 |
TCI : 549 Lakhs |
|
Cost of Project : 0 |
Every person needs good health and for good health we want good things for care of our health. To attain good health it is essential to follow good nu...
|
Capacity : 5 MT/annum |
Plant and Machinery cost: 170 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 47.00 |
|
Break Even Point (BEP): 30.00 |
TCI : 2542 Lakhs |
|
Cost of Project : 0 |
Ferrosilicon, or ferrosilicium, is a ferroalloy an alloy of iron and silicon with between 15 and 90% silicon. It contains a high proportion of iron s...
|
Capacity : 3000 MT/Annum |
Plant and Machinery cost: 243 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 63.00 |
TCI : Cost of Project : 816 Lakhs |
|
Cost of Project : 0 |
Steel is a generic name for a group of ferrous metals which due to their abundance durability versatility and low cost are most useful metallic materi...
|
Capacity : 90000 MT/year |
Plant and Machinery cost: 477 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project : 1738 lakhs |
|
Cost of Project : 0 |
-
|
Capacity : 50 MT/Day |
Plant and Machinery cost: Rs. 13 Crores |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 45.00 |
TCI : Rs. 18 Crores |
|
Cost of Project : 0 |
-
|
Capacity : 2 MT/Day |
Plant and Machinery cost: Rs. 35 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 46.00 |
TCI : Rs. 176 Lakhs |
|
Cost of Project : 0 |
-
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
-
|
Capacity : 2000 Containers/Year |
Plant and Machinery cost: Rs. 109 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 69.00 |
|
Break Even Point (BEP): 31.00 |
TCI : Rs. 1006 Lakhs |
|
Cost of Project : 0 |
DAIRY FARMING AND MILK PRODUCTS (Ghee, Pasturised Milk in Poly Pack), Cow Urine Processing and Packing in ½ Ltr. Glass Bottles with Biogas Plant...
|
Capacity : - |
Plant and Machinery cost: 162 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 47.00 |
|
Break Even Point (BEP): 32.00 |
TCI : 1665 Lakhs |
|
Cost of Project : 0 |
Steel is a generic name for an abundance durability, versatility and low cost are most useful metallic material known to mankind. Thermo Mechanical T...
|
Capacity : 100 MT/Day |
Plant and Machinery cost: 520 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project : 909 Lakhs |
|
Cost of Project : 0 |
Sorbitol, also known as glucitol, is a sugar alcohol that the body metabolises slowly. It is obtained by reduction of glucose changing the aldehyde gr...
|
Capacity : 4500 MT/Annum |
Plant and Machinery cost: 65 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 69.00 |
TCI : Cost of Project : 186 Lakhs |
|
Cost of Project : 0 |