Please choose a project below related to this category.
Profile Copper powder is finely granulated copper that has many metallurgic functions. The powder is cheaper than regular cast copper, so engineers c...
|
Capacity : 2 MT/ day |
Plant and Machinery cost: 27 Lakh |
|
Working Capital : - |
Rate of Return (ROR): 50.00 |
|
Break Even Point (BEP): 29.70 |
TCI : 792 Lakh |
|
Cost of Project : 0 |
Profile Goat and sheep rearing is the backbone of economy of small and landless farmers in India. It is an insurance against crop failure and provide...
|
Capacity : Goats: 500 Male & 500 Female Sheep: 500 Male & 500 Female |
Plant and Machinery cost: 11 Lakh |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 34.00 |
TCI : 209 Lakh |
|
Cost of Project : 0 |
Profile Maize is one of the cereal grains which produces throughout India and is placed 3rd position in agricultural base production. The products fr...
|
Capacity : - |
Plant and Machinery cost: 216 Lakh |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 57.00 |
TCI : Cost of the Project : 630 Lakh |
|
Cost of Project : 63000000 |
Profile Rolling allows sheet metal to be formed in to cylindrical shapes. This gives us the ability to make tanks, cylinders, bands and virtually any...
|
Capacity : 9000 MT SS Rolled Sheet/Annum,4500000 No.s of Set SS Utensils/Annum |
Plant and Machinery cost: 3642 Lakh |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 49.00 |
TCI : Cost of Project : 6391 Lakh |
|
Cost of Project : 639100000 |
Profile Goat is one of the world’s smallest domesticated livestock, have been actively managed for food and fiber earlier and longer than cattle and...
|
Capacity : 1000 Goats |
Plant and Machinery cost: 6 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 47.00 |
|
Break Even Point (BEP): 33.00 |
TCI : 115 Lakhs |
|
Cost of Project : 0 |
Profile Maize is third important cereal/crop after wheat and rice and has a great potential of processing due to its high nutritive value and commerc...
|
Capacity : - |
Plant and Machinery cost: 2531 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 44.00 |
TCI : Cost of project : 4639 Lakhs |
|
Cost of Project : 463900000 |
Profile: The lead-acid storage battery, an important energy storage device, is the most widely used secondary storage cell by automobile and other in...
|
Capacity : 300000 Nos./Annum |
Plant and Machinery cost: 416 Lakhs |
|
Working Capital : |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of project : 1327 Lakhs |
|
Cost of Project : 132700000 |
Profile: A fastener is a hardware device that mechanically joins or affixes two or more objects together. Fasteners mainly cover nuts, bolts, screws,...
|
Capacity : 2400 MT/Annum |
Plant and Machinery cost: 120 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 59.00 |
TCI : Cost of project: 417 Lakhs |
|
Cost of Project : 41700000 |
PRODUCT PROFILE The maize also called "Corn or Indian Corn" is widely cultivated in India; Maize ranks high among the four or five principal cereal c...
|
Capacity : - |
Plant and Machinery cost: 3175 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 33.00 |
|
Break Even Point (BEP): 40.00 |
TCI : 7310 Lakhs |
|
Cost of Project : 0 |
PRODUCT PROFILE Potato starch is starch extracted from potatoes. The cells of the root tubers of the potato plant contain starch grains (leucoplasts)...
|
Capacity : 45000 MT/Annum |
Plant and Machinery cost: 654 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 50.00 |
TCI : Cost of the project: 1618 Lakhs |
|
Cost of Project : 161800000 |
Chromite is an oxide of chromium and iron. The chemical composition of chromite is FeO.Cr2O3 or FeCr2O4. Chromite is the only commercial source of chr...
|
Capacity : 18,000 MT/Annum Chromite Concentrate |
Plant and Machinery cost: 110 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 65.00 |
TCI : Cost of Project : 366 Lakhs |
|
Cost of Project : 36600000 |
Calcined bauxite is an important raw material for two main markets: refractories and abrasives. Smaller volumes are consumed in other applications inc...
|
Capacity : 60,000 MT/Annum |
Plant and Machinery cost: 438 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 63.00 |
TCI : Cost of Project : 1214 Lakhs |
|
Cost of Project : 121400000 |