Please choose a project below related to this category.
Thermo Mechanical Treatment (TMT) process for reinforcement bars is opening up new vistas in composite RCC, the re-enforcing steel is the costliest c...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Hot rolling, also called hot working, is a metallurgical process of in which large pieces of metal such as slabs or billets are deformed between rolle...
|
Capacity : 10,00,000 MT / Annum |
Plant and Machinery cost: 79 Crores |
|
Working Capital : - |
Rate of Return (ROR): 47.00 |
|
Break Even Point (BEP): 55.00 |
TCI : Cost of Project : 197 Crores |
|
Cost of Project : 0 |
Thermo Mechanical Treatment (TMT) is a term used to describe a variety of process combining controlled thermal and deformation treatment to obtain syn...
|
Capacity : 50,000 MT/Annum |
Plant and Machinery cost: 310 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 74.00 |
TCI : Cost of Project : 1189 Lakhs |
|
Cost of Project : 0 |
Ginger was one of the first of the oriental species to be introduced into Europe and later to the Americas. The first year crop is one of the best qu...
|
Capacity : 5 MT/Day |
Plant and Machinery cost: 37 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 37.00 |
TCI : 246 Lakhs |
|
Cost of Project : 0 |
A genus of rhizomatous herbs distributed in the tropics of the world. Fourteen, species are reported to occur in India Z-officinale, which is the main...
|
Capacity : 750 Ton |
Plant and Machinery cost: 3 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 52.00 |
|
Break Even Point (BEP): 40.00 |
TCI : 47 Lakhs |
|
Cost of Project : 0 |
Caramel color is one of the most widely used colorants in foods. It is also called the color of burnt sugar. It is made by heating food grade carbohyd...
|
Capacity : 300 MT / Annum |
Plant and Machinery cost: 33 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project : 113 Lakh |
|
Cost of Project : 0 |
Steel is a generic name for a group of ferrous metals due to their abundance durability versatility and low costs are most useful metallic material k...
|
Capacity : 1,00,000 MT / Annum |
Plant and Machinery cost: 608 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 64.00 |
TCI : Cost of Project : 2808 Lakhs |
|
Cost of Project : 0 |
Processing Unit of Bael, Pine apple, Lychee Juices Bael (Aegle marmelos) is a fruit-bearing tree indigenous to dry forests on hills and plains of ce...
|
Capacity : 10,000 Bottles / Day (Pineapple, Lychee, Bael Juices) |
Plant and Machinery cost: 48 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 61.00 |
|
Break Even Point (BEP): 34.00 |
TCI : 166 Lakhs |
|
Cost of Project : 0 |
-
|
Capacity : 15000 Broilers, 4 Lakhs Eggs, 500 Birds/Annum |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 64.00 |
TCI : 16 lakhs |
|
Cost of Project : 0 |
-
|
Capacity : 4 MT/Day |
Plant and Machinery cost: Rs. 31 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 41.00 |
TCI : Rs. 167 Lakhs |
|
Cost of Project : 0 |
Starch is a group of polysaccharides, composed of glucopyranose units joined together by-glucosidric linkages. Industrially starch is divided into tw...
|
Capacity : Starch 100 MT, Liquid Glucose 2 MT,Dextrose Anhydrous 10 MT, Monohydrate 13 MT,Sorbital 17 MT, Vitamin C 0.5 MT/Day |
Plant and Machinery cost: 714 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 40.00 |
TCI : Cost of Project : 3969 Lakhs |
|
Cost of Project : 0 |
Refined vegetable oil is considered to be high quality edible oil because of its non-cholesterol properties. Its main use in the world is in cooking,...
|
Capacity : 75 MT / Day |
Plant and Machinery cost: 141 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 55.00 |
|
Break Even Point (BEP): 22.00 |
TCI : 3395 Lakhs |
|
Cost of Project : 0 |