Please choose a project below related to this category.
A genus of rhizomatous herbs distributed in the tropics of the world. Fourteen, species are reported to occur in India Z-officinale, which is the main...
|
Capacity : 750 Ton |
Plant and Machinery cost: 3 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 52.00 |
|
Break Even Point (BEP): 40.00 |
TCI : 47 Lakhs |
|
Cost of Project : 0 |
Caramel color is one of the most widely used colorants in foods. It is also called the color of burnt sugar. It is made by heating food grade carbohyd...
|
Capacity : 300 MT / Annum |
Plant and Machinery cost: 33 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project : 113 Lakh |
|
Cost of Project : 0 |
Steel is a generic name for a group of ferrous metals due to their abundance durability versatility and low costs are most useful metallic material k...
|
Capacity : 1,00,000 MT / Annum |
Plant and Machinery cost: 608 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 64.00 |
TCI : Cost of Project : 2808 Lakhs |
|
Cost of Project : 0 |
Processing Unit of Bael, Pine apple, Lychee Juices Bael (Aegle marmelos) is a fruit-bearing tree indigenous to dry forests on hills and plains of ce...
|
Capacity : 10,000 Bottles / Day (Pineapple, Lychee, Bael Juices) |
Plant and Machinery cost: 48 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 61.00 |
|
Break Even Point (BEP): 34.00 |
TCI : 166 Lakhs |
|
Cost of Project : 0 |
-
|
Capacity : 15000 Broilers, 4 Lakhs Eggs, 500 Birds/Annum |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 64.00 |
TCI : 16 lakhs |
|
Cost of Project : 0 |
-
|
Capacity : 4 MT/Day |
Plant and Machinery cost: Rs. 31 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 41.00 |
TCI : Rs. 167 Lakhs |
|
Cost of Project : 0 |
Starch is a group of polysaccharides, composed of glucopyranose units joined together by-glucosidric linkages. Industrially starch is divided into tw...
|
Capacity : Starch 100 MT, Liquid Glucose 2 MT,Dextrose Anhydrous 10 MT, Monohydrate 13 MT,Sorbital 17 MT, Vitamin C 0.5 MT/Day |
Plant and Machinery cost: 714 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 40.00 |
TCI : Cost of Project : 3969 Lakhs |
|
Cost of Project : 0 |
Refined vegetable oil is considered to be high quality edible oil because of its non-cholesterol properties. Its main use in the world is in cooking,...
|
Capacity : 75 MT / Day |
Plant and Machinery cost: 141 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 55.00 |
|
Break Even Point (BEP): 22.00 |
TCI : 3395 Lakhs |
|
Cost of Project : 0 |
Toughened glass is a type of soda-lime-silica glass which has been mechanically strengthens by a thermal process in which a layer of compression has...
|
Capacity : 30 MT / Day |
Plant and Machinery cost: 140 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 49.00 |
|
Break Even Point (BEP): 27.00 |
TCI : 1334 Lakhs |
|
Cost of Project : 0 |
Ilmenite is the most common of the titanium minerals and is frequently associated with magnetite. Ilmenite is a iron black minerals black to brownish...
|
Capacity : 30 MT / Day |
Plant and Machinery cost: 361 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 35.00 |
TCI : 2074 Lakhs |
|
Cost of Project : 0 |
There is significant increase in demand for pre-coated galvanized sheet-for industrial, storage and warehousing projects. In USA & Europe 55% Alumini...
|
Capacity : 15 MT / Day |
Plant and Machinery cost: 58 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 50.00 |
|
Break Even Point (BEP): 27.00 |
TCI : 793 Lakhs |
|
Cost of Project : 0 |
Coconut oil, also known as coconut butter, is a tropical oil with many applications. It is extracted from copra (derived from the word "kopra" which...
|
Capacity : 600 Tons/Annum |
Plant and Machinery cost: 19 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 60.00 |
TCI : Cost of Project : 94 Lakhs |
|
Cost of Project : 0 |