Please choose a project below related to this category.
In India dairying has been practiced as a rural cottage, since the remote past. Semi commercial dairying started with the establishment of military d...
|
Capacity : 3000 Lts. / Day |
Plant and Machinery cost: 8 Lakh |
|
Working Capital : - |
Rate of Return (ROR): 47.00 |
|
Break Even Point (BEP): 36.00 |
TCI : 116 Lakh |
|
Cost of Project : 0 |
Most Indian prefers goat flesh to other meat, although it is comparatively higher in price. Goat’s milk is popular with many being highly nourishin...
|
Capacity : 200 Lts. Milk /Day |
Plant and Machinery cost: 4 Lakh |
|
Working Capital : - |
Rate of Return (ROR): 40.00 |
|
Break Even Point (BEP): 47.00 |
TCI : 19 Lakh |
|
Cost of Project : 0 |
Pig rearing can be paying sufficient attention is given to the selection of good quality stock and to the proper management of herd. Where there is a...
|
Capacity : 1500 Pig Per Annum |
Plant and Machinery cost: 2 Lakh |
|
Working Capital : - |
Rate of Return (ROR): 54.00 |
|
Break Even Point (BEP): 44.00 |
TCI : 32 Lakh |
|
Cost of Project : 0 |
India is one of the largest milk producing countries in the world. It has crossed 70 million tonnes milk production in the world. The milk industry i...
|
Capacity : 24,000 Kg. Milk / Day |
Plant and Machinery cost: 671 Lakh |
|
Working Capital : - |
Rate of Return (ROR): 36.00 |
|
Break Even Point (BEP): 39.00 |
TCI : 1500 Lakh |
|
Cost of Project : 0 |
Rabbit farming on a relatively small scale, involving minimal inputs, could make a substantial contribution to the supply of animal protein for human...
|
Capacity : 133 Nos. / Day |
Plant and Machinery cost: 2 Lakh (App.) |
|
Working Capital : - |
Rate of Return (ROR): 23.00 |
|
Break Even Point (BEP): 54.00 |
TCI : 20 Lakh (App.) |
|
Cost of Project : 0 |
Rabbits are warms blooded mammals possessing a hairy coat or fur or quills on their body. Flesh of hares and rabbit is reported to be eastern in many...
|
Capacity : 5000 Angora rabbit Farming, 2 MT Rabbit feed/hr,100 kg Rabbit Yarn wool |
Plant and Machinery cost: 611 Lakh |
|
Working Capital : - |
Rate of Return (ROR): 61.00 |
|
Break Even Point (BEP): 36.00 |
TCI : 919 Lakh |
|
Cost of Project : 0 |
Calcium carbonate occurs naturally as the principal constituent of limestone, marble and chalk. Powdered calcium carbonate is produced by two metho...
|
Capacity : 300 MT / Day |
Plant and Machinery cost: 12 Crores |
|
Working Capital : - |
Rate of Return (ROR): 85.00 |
|
Break Even Point (BEP): 28.00 |
TCI : 29 Crores |
|
Cost of Project : 0 |
Garlic powder means garlic in powder form. Powder form means moisture less or dehydrated form. In other words, dehydrated garlic is in flour form. Du...
|
Capacity : 300 Kgs / Day |
Plant and Machinery cost: 6 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 51.00 |
|
Break Even Point (BEP): 45.00 |
TCI : 64 Lakhs |
|
Cost of Project : 0 |
Fruits naturally possessing relatively large amount of pectin include lemons, bitter oranges, apples, quinees, currants and plums. It is less plentif...
|
Capacity : 460 Kg. / Day |
Plant and Machinery cost: 63 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 45.00 |
TCI : 266 Lakhs |
|
Cost of Project : 0 |
Manufacturing of steel tubes & pipes a Mechanical Engineering is mostly produced in large scale. ERW steel tubes are chiefly used in bicycles, transf...
|
Capacity : 3600 MT / Annum |
Plant and Machinery cost: 115 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 57.00 |
TCI : Cost of Project : 234 Lakhs |
|
Cost of Project : 0 |
There are various processes by which metal can be shaped such as forging, extrusions, pressing, welding, rolling and costing. Among the various proce...
|
Capacity : 18000 MT / Annum |
Plant and Machinery cost: 173 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 64.00 |
TCI : Cost of Project : 499 Lakhs |
|
Cost of Project : 0 |
Fresh tomatoes are very refreshing and appetizing. They are a good source of vitamin C. Most of the tomatoes products are made from tomato pulp, which...
|
Capacity : 1200 MT / Annum |
Plant and Machinery cost: 38 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 39.00 |
|
Break Even Point (BEP): 59.00 |
TCI : Cost of Project : 130 Lakhs |
|
Cost of Project : 0 |