Please choose a project below related to this category.
Caramel color is one of the most widely used colorants in foods. It is also called the color of burnt sugar. It is made by heating food grade carbohyd...
|
Capacity : 300 MT / Annum |
Plant and Machinery cost: 33 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project : 113 Lakh |
|
Cost of Project : 0 |
Steel is a generic name for a group of ferrous metals due to their abundance durability versatility and low costs are most useful metallic material k...
|
Capacity : 1,00,000 MT / Annum |
Plant and Machinery cost: 608 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 64.00 |
TCI : Cost of Project : 2808 Lakhs |
|
Cost of Project : 0 |
Processing Unit of Bael, Pine apple, Lychee Juices Bael (Aegle marmelos) is a fruit-bearing tree indigenous to dry forests on hills and plains of ce...
|
Capacity : 10,000 Bottles / Day (Pineapple, Lychee, Bael Juices) |
Plant and Machinery cost: 48 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 61.00 |
|
Break Even Point (BEP): 34.00 |
TCI : 166 Lakhs |
|
Cost of Project : 0 |
-
|
Capacity : 15000 Broilers, 4 Lakhs Eggs, 500 Birds/Annum |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 64.00 |
TCI : 16 lakhs |
|
Cost of Project : 0 |
-
|
Capacity : 4 MT/Day |
Plant and Machinery cost: Rs. 31 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 41.00 |
TCI : Rs. 167 Lakhs |
|
Cost of Project : 0 |
Starch is a group of polysaccharides, composed of glucopyranose units joined together by-glucosidric linkages. Industrially starch is divided into tw...
|
Capacity : Starch 100 MT, Liquid Glucose 2 MT,Dextrose Anhydrous 10 MT, Monohydrate 13 MT,Sorbital 17 MT, Vitamin C 0.5 MT/Day |
Plant and Machinery cost: 714 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 40.00 |
TCI : Cost of Project : 3969 Lakhs |
|
Cost of Project : 0 |
Refined vegetable oil is considered to be high quality edible oil because of its non-cholesterol properties. Its main use in the world is in cooking,...
|
Capacity : 75 MT / Day |
Plant and Machinery cost: 141 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 55.00 |
|
Break Even Point (BEP): 22.00 |
TCI : 3395 Lakhs |
|
Cost of Project : 0 |
Toughened glass is a type of soda-lime-silica glass which has been mechanically strengthens by a thermal process in which a layer of compression has...
|
Capacity : 30 MT / Day |
Plant and Machinery cost: 140 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 49.00 |
|
Break Even Point (BEP): 27.00 |
TCI : 1334 Lakhs |
|
Cost of Project : 0 |
Ilmenite is the most common of the titanium minerals and is frequently associated with magnetite. Ilmenite is a iron black minerals black to brownish...
|
Capacity : 30 MT / Day |
Plant and Machinery cost: 361 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 35.00 |
TCI : 2074 Lakhs |
|
Cost of Project : 0 |
There is significant increase in demand for pre-coated galvanized sheet-for industrial, storage and warehousing projects. In USA & Europe 55% Alumini...
|
Capacity : 15 MT / Day |
Plant and Machinery cost: 58 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 50.00 |
|
Break Even Point (BEP): 27.00 |
TCI : 793 Lakhs |
|
Cost of Project : 0 |
Coconut oil, also known as coconut butter, is a tropical oil with many applications. It is extracted from copra (derived from the word "kopra" which...
|
Capacity : 600 Tons/Annum |
Plant and Machinery cost: 19 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 60.00 |
TCI : Cost of Project : 94 Lakhs |
|
Cost of Project : 0 |
Coconut oil, also known as coconut butter, is a tropical oil with many applications. It is extracted from copra (derived from the word "kopra" which...
|
Capacity : 600 Tons/Annum |
Plant and Machinery cost: 19 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 60.00 |
TCI : Cost of Project : 94 Lakhs |
|
Cost of Project : 0 |