Investment Opportunities & Business Ideas in Mexico, North America - Identification and Selection of right Project, Thrust areas for Investment, Industry Startup and Entrepreneurship Projects

Please choose a project below related to this category.

DAIRY FARMING WITH POWER PLANT BASED ON DUNG - Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Feasibility Study, Investment Opportunities, Cost and Revenue
DAIRY FARMING WITH POWER PLANT BASED ON DUNG - Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Feasibility Study, Investment Opportunities, Cost and Revenue

The importance of milk in human diet especially for children and expectant and nursing matters is vital. To meet the demand of the increasing populat...

Capacity :

27000 Kgs. Milk / Day, 5 MW Power Plant Based on Cow Dung

Plant and Machinery cost:

4 Crores

Working Capital :

-

Rate of Return (ROR):

43.00

Break Even Point (BEP):

32.00

TCI :

25 Crores

Cost of Project :

0

PLASTER OF PARIS - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue, Plant Layout
PLASTER OF PARIS - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue, Plant Layout

Plaster of Paris or simply plaster, is a type of building material based on calcium sulphate hemihydrate. It is created by heating. Gypsum to about 1...

Capacity :

50 MT / Day

Plant and Machinery cost:

47 Lakhs

Working Capital :

-

Rate of Return (ROR):

49.00

Break Even Point (BEP):

45.00

TCI :

3 Crores

Cost of Project :

0

COPPER WIRE DRAWING (From Higher Size to Very Thin Size Used in Electrical Cables) - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials
COPPER WIRE DRAWING (From Higher Size to Very Thin Size Used in Electrical Cables) - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials

Copper wire is an essential material for electrical cables, motor and transformer winding. It is available in different gauges. The gauge of the copp...

Capacity :

500 Kg. / Day

Plant and Machinery cost:

68 Lakhs

Working Capital :

-

Rate of Return (ROR):

43.00

Break Even Point (BEP):

46.00

TCI :

Cost of Project : 167 Lakhs

Cost of Project :

0

MAIZE PROCESSING UNIT (Starch, Glucose, Germs, Fibres, Gluten & Steep Water)- Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Plant Layout
MAIZE PROCESSING UNIT (Starch, Glucose, Germs, Fibres, Gluten & Steep Water)- Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Plant Layout

The maize also called “Corn or Indian Corn is widely cultivated in India. Maize ranks high among the four or five principal cereal crops of the wor...

Capacity :

200 MT Maize Processing/ Day

Plant and Machinery cost:

32 Crores

Working Capital :

-

Rate of Return (ROR):

33.00

Break Even Point (BEP):

40.00

TCI :

73 Crores

Cost of Project :

0

PRESERVATIVE FREE JAM (Fruit Spreads) & Organic Jam Making - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study
PRESERVATIVE FREE JAM (Fruit Spreads) & Organic Jam Making - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study

There has been considerable increase in the consumption of fruits and vegetables juice beverages in the world during the last few years. Fruit juice...

Capacity :

2000 Kgs. / Day

Plant and Machinery cost:

18 Lakhs

Working Capital :

-

Rate of Return (ROR):

74.00

Break Even Point (BEP):

29.00

TCI :

2 Crores

Cost of Project :

0

Transmission Tower & Tele Communication Tower with Galvanizing Plant - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study
Transmission Tower & Tele Communication Tower with Galvanizing Plant - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study

The purpose of a transmission line tower is to support conductors carrying electrical power and one or two ground wires at suitable distances above t...

Capacity :

24,000 MT /Year

Plant and Machinery cost:

149 Lakhs

Working Capital :

-

Rate of Return (ROR):

46.00

Break Even Point (BEP):

53.00

TCI :

Cost of Project : 716 Lakhs

Cost of Project :

0

WINE FROM GRAPES - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue, Plant Layout
WINE FROM GRAPES - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue, Plant Layout

Wine is an alcoholic beverage made from the fermentation of grape juice. The natural chemical balance of grapes is such that they can ferment without...

Capacity :

9,00,000 Ltrs./ Annum

Plant and Machinery cost:

237 Lakhs

Working Capital :

-

Rate of Return (ROR):

43.00

Break Even Point (BEP):

49.00

TCI :

Cost of Project : 555 Lakhs

Cost of Project :

55500000

POULTRY & CATTLE FEED - Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Feasibility Study, Investment Opportunities, Cost and Revenue, Plant Economics
POULTRY & CATTLE FEED - Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Feasibility Study, Investment Opportunities, Cost and Revenue, Plant Economics

In India the animal feed industry is of recent origin. There are today as many as 14 plants in the organized sector. All of them have excellent facil...

Capacity :

34 MT / Day

Plant and Machinery cost:

10 Lakh

Working Capital :

-

Rate of Return (ROR):

51.00

Break Even Point (BEP):

40.00

TCI :

2.64 Crore

Cost of Project :

0

COPPER INGOT / COPPER ASH FROM COPPER ORE - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities
COPPER INGOT / COPPER ASH FROM COPPER ORE - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities

Copper is the perfect material for recycling. It is valuable, easy to identify, easy to clean, heavy and can be much use to foundries & other non-fer...

Capacity :

3000 MT / Annum

Plant and Machinery cost:

279 Lakh

Working Capital :

-

Rate of Return (ROR):

46.00

Break Even Point (BEP):

45.00

TCI :

Cost of Project : 684 Lakh

Cost of Project :

0

ROCK WOOL - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue, Plant Economics
ROCK WOOL - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue, Plant Economics

Rock wool is mostly silicate compound of calcium and very smaller amount of copper, iron & manganese. It is fundamental form of solid characterized b...

Capacity :

-

Plant and Machinery cost:

-

Working Capital :

-

Rate of Return (ROR):

1.00

Break Even Point (BEP):

1.00

TCI :

-

Cost of Project :

0

SPONGE IRON PLANT - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue
SPONGE IRON PLANT - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue

Sponge iron is the product created when iron ore is reduced to metallic iron, usually with some kind of carbon (charcoal, etc), at temperatures below...

Capacity :

135000 MT / Annum

Plant and Machinery cost:

7175 Lakhs

Working Capital :

-

Rate of Return (ROR):

42.00

Break Even Point (BEP):

25.00

TCI :

Cost of Project : 8923 Lakhs

Cost of Project :

0

Fruit Juice (Mango, Orange & Litchi) & Sugarcane Juice In Aseptic Packaging & Pet Bottles - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials
Fruit Juice (Mango, Orange & Litchi) & Sugarcane Juice In Aseptic Packaging & Pet Bottles - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials

Fruit juices are health drinks; it is largely used throughout the society and popularity of fruit juices are gradually increasing. There is good scope...

Capacity :

Mango Juice 3600 KLs., Orange Juice 3600 KLs,Litchi Juice 3600 KLs,Sugarcane Juice 720 KLs Per Annum

Plant and Machinery cost:

275 Lakhs

Working Capital :

-

Rate of Return (ROR):

43.00

Break Even Point (BEP):

52.00

TCI :

Cost of Project : 726 Lakhs

Cost of Project :

0

Make An Appointment

Talk to Our Experts Today!

appoinment
Call Us WhatsApp