Please choose a project below related to this category.
-
|
Capacity : 50 MT/Day |
Plant and Machinery cost: Rs. 13 Crores |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 45.00 |
TCI : Rs. 18 Crores |
|
Cost of Project : 0 |
-
|
Capacity : 2 MT/Day |
Plant and Machinery cost: Rs. 35 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 46.00 |
TCI : Rs. 176 Lakhs |
|
Cost of Project : 0 |
-
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
-
|
Capacity : 2000 Containers/Year |
Plant and Machinery cost: Rs. 109 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 69.00 |
|
Break Even Point (BEP): 31.00 |
TCI : Rs. 1006 Lakhs |
|
Cost of Project : 0 |
DAIRY FARMING AND MILK PRODUCTS (Ghee, Pasturised Milk in Poly Pack), Cow Urine Processing and Packing in ½ Ltr. Glass Bottles with Biogas Plant...
|
Capacity : - |
Plant and Machinery cost: 162 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 47.00 |
|
Break Even Point (BEP): 32.00 |
TCI : 1665 Lakhs |
|
Cost of Project : 0 |
Steel is a generic name for an abundance durability, versatility and low cost are most useful metallic material known to mankind. Thermo Mechanical T...
|
Capacity : 100 MT/Day |
Plant and Machinery cost: 520 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project : 909 Lakhs |
|
Cost of Project : 0 |
Sorbitol, also known as glucitol, is a sugar alcohol that the body metabolises slowly. It is obtained by reduction of glucose changing the aldehyde gr...
|
Capacity : 4500 MT/Annum |
Plant and Machinery cost: 65 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 69.00 |
TCI : Cost of Project : 186 Lakhs |
|
Cost of Project : 0 |
Sorbitol is a water soluble polyhydric alcohol, having sweet taste and high stability besides properties of humectancy and plastisizing used in manuf...
|
Capacity : 35 MT/Day, 15 MT Sorbitol, 5 MT Maltitol, 10 MT Dextrose Anhydrous, 5 MT/Day Vitamin C |
Plant and Machinery cost: 607 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 39.00 |
|
Break Even Point (BEP): 39.00 |
TCI : 2332 Lakhs |
|
Cost of Project : 0 |
Magnesium oxide, or magnesia is a white solid mineral that occurs naturally as periclase and is a source of magnesium. It has empirical formula of Mg...
|
Capacity : 48 MT/Day |
Plant and Machinery cost: Rs. 2700 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 34.00 |
TCI : Rs. 6650 Lakhs |
|
Cost of Project : 0 |
Calcined bauxite is an important raw material for two main products, refractories and abrasives. Smaller volumes are consumed in other applications in...
|
Capacity : 36000 MT/Annum |
Plant and Machinery cost: 318 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 61.00 |
TCI : Cost of Project : 882 Lakhs |
|
Cost of Project : 0 |
-
|
Capacity : 200 Ton/Annum |
Plant and Machinery cost: Rs. 4 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 52.00 |
|
Break Even Point (BEP): 32.00 |
TCI : Rs. 45 Lakhs |
|
Cost of Project : 0 |
-
|
Capacity : 3000 MT/Annum |
Plant and Machinery cost: Rs. 332 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 50.00 |
TCI : Cost of Project : Rs. 533 Lakhs |
|
Cost of Project : 0 |