Please choose a project below related to this category.
Oxygen and nitrogen are the most important industrial gases finding its application in large quantities in metal fabrication and cutting industries. I...
|
Capacity : 1200 Cubic Meter/Day |
Plant and Machinery cost: 21 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 40.00 |
|
Break Even Point (BEP): 52.00 |
TCI : 68 Lakhs |
|
Cost of Project : 0 |
Steel is a generic name for a group of ferrous metals due to their abundance, durability, versatility and low cost, are most useful metallic material...
|
Capacity : 480 M.T/day |
Plant and Machinery cost: 332 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 76.00 |
TCI : Cost of Project: 1949 Lakhs |
|
Cost of Project : 0 |
PVC/HDPE Pipes are produced by extrusion process followed by calibration to ensure internal diameter with smooth internal boxes. These pipes are gener...
|
Capacity : 115000 Mtr/Annum PVC Pipes, 125000 Mtr/Annum HDPE Pipes |
Plant and Machinery cost: 292 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 42.00 |
TCI : Cost of Project : 640 Lakhs |
|
Cost of Project : 0 |
Concrete block technology is based on the principle of densification of a lean concrete mix to make a regular shaped, uniform, high performance masonr...
|
Capacity : 144 Lakhs Hollow Blocks/year, 288 Lakhs Paving Tiles/year |
Plant and Machinery cost: 598 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 34.00 |
TCI : Cost of Project : 1234 Lakhs |
|
Cost of Project : 0 |
The forging industry as it known today, make use of various type of forging equipments for the practical duplication of forged part for commercial use...
|
Capacity : 6 MT / Day |
Plant and Machinery cost: 217 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 63.00 |
TCI : Cost of Project : 435 Lakhs |
|
Cost of Project : 0 |
Roofs are basic element of shelter to protect the people themselves from cold, wind rain and sun. Tiles are thin slabs of baked clay used for constru...
|
Capacity : 5000 Nos. /Day |
Plant and Machinery cost: 39 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 43.00 |
TCI : 163 Lakhs |
|
Cost of Project : 0 |
-
|
Capacity : 66.66 MT/Day |
Plant and Machinery cost: Rs. 671 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 38.00 |
TCI : Rs. 2112 Lakhs |
|
Cost of Project : 0 |
-
|
Capacity : 300 MT Liquid/year, 300 MT Powder/year |
Plant and Machinery cost: 19 Lakh |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 63.00 |
TCI : Cost of Project : Rs. 66.67 Lakhs |
|
Cost of Project : 0 |
Thermo Mechanical Treatment (TMT) process for reinforcement bars is opening up new vistas in composite RCC, the re-enforcing steel is the costliest c...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Aluminium is most abundant metallic element is used on earth. Various section of aluminium is used in building are rods, wires, channel etc are the st...
|
Capacity : 1500 MT /Year |
Plant and Machinery cost: 145 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 38.00 |
|
Break Even Point (BEP): 73.00 |
TCI : Cost of Project : 415 Lakhs |
|
Cost of Project : 0 |
Aluminium is most abundant metallic element is used on earth. Various section of aluminium is used in building are rods, wires, channel etc are the st...
|
Capacity : 1500 MT /Year |
Plant and Machinery cost: 145 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 38.00 |
|
Break Even Point (BEP): 73.00 |
TCI : Cost of Project : 415 Lakhs |
|
Cost of Project : 0 |
Term furniture is used for articles of daily use in hospitals, public building, business places, house-etc and also include various items like chairs,...
|
Capacity : 1800 MT /Year |
Plant and Machinery cost: 75 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 70.00 |
TCI : Cost of Project : 395 Lakhs |
|
Cost of Project : 0 |