Please choose a project below related to this category.
The protection of food stuffs from spoilage by moulds and bacteria is a major concern of the food technologist. Potatoes can be consumed in varied f...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Banana can be preserved for 3 months or more by reducing the moisture in it by drying or frying. In India, food is preserved by sun-drying, mostly fru...
|
Capacity : 100 Kgs/Day |
Plant and Machinery cost: Rs. 3 Lakhs |
|
Working Capital : Rs. 10 Lakhs |
Rate of Return (ROR): 44.53 |
|
Break Even Point (BEP): 47.77 |
TCI : Rs. 18 Lakhs |
|
Cost of Project : 0 |
Potato is widely consumed as food all over the world. Potato chips are basically used for snacks purposes. They are produced by rapid dehydration of p...
|
Capacity : 2000 Kgs/Day |
Plant and Machinery cost: Rs. 137 Lakhs |
|
Working Capital : Rs. 91 Lakhs |
Rate of Return (ROR): 39.21 |
|
Break Even Point (BEP): 40.17 |
TCI : Rs. 271 Lakhs |
|
Cost of Project : 0 |
In the brackish water of coastal areas the Prawns and shrimps grow naturally. In the prawn/Shrimp farming the body prawns & shrimp are grown in contro...
|
Capacity : 1200 Tons/Annum (Land & Building cost 460 Lacs) |
Plant and Machinery cost: Rs. 50 Lacs |
|
Working Capital : Rs. 61 Lacs |
Rate of Return (ROR): 59.00 |
|
Break Even Point (BEP): 28.00 |
TCI : Rs. 609 Lacs |
|
Cost of Project : 0 |
Aquaculture technology of sweet water fish farming is a good project for new entrepreneur and to meet up the demand growth of fish utilization.
|
Capacity : 1000 MT Fish/Annum |
Plant and Machinery cost: Rs. 150 Lacs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 47.00 |
TCI : Rs. 200 Lacs |
|
Cost of Project : 0 |
Admixtures are materials added to the concrete before or during its mixing, with a view to modifying one or more of the properties of concrete in the...
|
Capacity : 2000 Kgs/Day |
Plant and Machinery cost: Rs. 8 Lakhs |
|
Working Capital : Rs. 134 Lakhs |
Rate of Return (ROR): 51.74 |
|
Break Even Point (BEP): 40.21 |
TCI : Rs. 160.00 Lakhs |
|
Cost of Project : 0 |
Cement is a very important building material. It is used in almost all the constructions and is subjected to water in contact. If the concrete or ceme...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 39.28 |
|
Break Even Point (BEP): 48.99 |
TCI : - |
|
Cost of Project : 0 |
Admixtures are materials added to the concrete before or during its mixing, with a view to modifying one or more of the properties of concrete in the...
|
Capacity : 2000 Kgs/Day |
Plant and Machinery cost: 8 Lakhs |
|
Working Capital : 134 Lakhs |
Rate of Return (ROR): 52.00 |
|
Break Even Point (BEP): 41.00 |
TCI : 160 Lakhs |
|
Cost of Project : 0 |
The general outlook for the cement industry is fulfilled the situation in a large body of Indian Industry, with a market rise in production failing to...
|
Capacity : 50 MT/Day |
Plant and Machinery cost: Rs. 84 Lacs |
|
Working Capital : Rs. 74 Lacs |
Rate of Return (ROR): 23.00 |
|
Break Even Point (BEP): 63.00 |
TCI : Rs. 250 Lacs |
|
Cost of Project : 0 |