Please choose a project below related to this category.
Roofs are basic element of shelter to protect the people themselves from cold, wind rain and sun. Tiles are thin slabs of baked clay used for constru...
|
Capacity : 5000 Nos. /Day |
Plant and Machinery cost: 39 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 43.00 |
TCI : 163 Lakhs |
|
Cost of Project : 0 |
Graphite is a form of elemental carbon. It is one of the three allotropic forms which the element carbon exists in nature the other two being coal an...
|
Capacity : 24 MT/Day |
Plant and Machinery cost: 1482 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 48.00 |
TCI : Cost of Project : 2669 Lakhs |
|
Cost of Project : 266900000 |
Wheat starch is produced from wheat species such as Triticum aestivum, which is also known as bread wheat. Starch is one of the main carbohydrate in w...
|
Capacity : 1.0 Ton/Day (Gluten), 16.66 MT Wheat Starch /Day |
Plant and Machinery cost: Rs. 100 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 24.00 |
|
Break Even Point (BEP): 58.00 |
TCI : Rs. 350 Lakhs |
|
Cost of Project : 0 |
Cardanol is a naturally occurring phenol manufactured from cashew nut shell liquid (CNSL), a by product of cashew nut processing. Distillation of CNS...
|
Capacity : 10 MT/Day |
Plant and Machinery cost: 70 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 49.00 |
|
Break Even Point (BEP): 30.00 |
TCI : 717 Lakhs |
|
Cost of Project : 0 |
Cashew (Botanical name Anacardium Occidentale) is introduced in India by the portugese four centuries ago mainly to prevent soil errosion. Cashew rank...
|
Capacity : 21 MT/Day C.N.S.L |
Plant and Machinery cost: 42 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 51.00 |
|
Break Even Point (BEP): 34.00 |
TCI : 501 Lakhs |
|
Cost of Project : 0 |
-
|
Capacity : 15000 Broilers, 4 Lakhs Eggs, 500 Birds/Annum |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 64.00 |
TCI : 16 lakhs |
|
Cost of Project : 0 |
The term cement is used to designate many different kinds of substances that are used as binders. The term cements as used henceforth will be confined...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Ready mix concrete is a modern trend of introduction in the Asian countries. It is new concept of use concrete in the construction area. Ready mix has...
|
Capacity : 8000 No. Concrete Block / Day, 165 Cubic Meter Ready Mix Concrete / Day |
Plant and Machinery cost: 5 Crores |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 39.00 |
TCI : 12 Crores |
|
Cost of Project : 0 |
Starch is a group of polysaccharides, composed of glucopyranose units joined together by-glucosidric linkages. Industrially starch is divided into tw...
|
Capacity : Starch 100 MT, Liquid Glucose 2 MT,Dextrose Anhydrous 10 MT, Monohydrate 13 MT,Sorbital 17 MT, Vitamin C 0.5 MT/Day |
Plant and Machinery cost: 714 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 40.00 |
TCI : Cost of Project : 3969 Lakhs |
|
Cost of Project : 0 |
Potato starch is essential as a universal binding and food thickening agent. Leveraging on over expertise in potato starch production, we began produc...
|
Capacity : 167 MT / Day |
Plant and Machinery cost: 463 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 51.00 |
|
Break Even Point (BEP): 27.00 |
TCI : 3843 Lakhs |
|
Cost of Project : 0 |
Coal tar pitch is the residue from the processing of coal tar. Since pitch constituents over 50% of crude tar, its utilization has a major effect on t...
|
Capacity : 7500 MT/Annum |
Plant and Machinery cost: 143 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project : 340 Lakhs |
|
Cost of Project : 0 |
Banana is a fair source of calcium iron and a rich source of potassium magnesium, sodium & potassium. Because aids in combating diarrhoea intestina...
|
Capacity : 54 MT / Day |
Plant and Machinery cost: 18 Crores |
|
Working Capital : - |
Rate of Return (ROR): 41.88 |
|
Break Even Point (BEP): 37.93 |
TCI : 31 Crores |
|
Cost of Project : 0 |