Please choose a project below related to this category.
Steel is one such material that has played an important role in the development of mankind in the last century. Today, it is difficult to imagine a wo...
|
Capacity : 36000 MT/Annum |
Plant and Machinery cost: 408 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 48.00 |
TCI : Cost of Project : 1543 Lakhs |
|
Cost of Project : 0 |
Glucose Syrup is a clear, colourless, viscous solution making it compatible with the physical properties desired in the end products chemically, gluco...
|
Capacity : 42000 MT/Annum (Corn Processing), 125 MT Glucose Syrup Per Day., 125 MT Fructose Per Day. |
Plant and Machinery cost: 430 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 39.00 |
|
Break Even Point (BEP): 46.00 |
TCI : 1 Million |
|
Cost of Project : 0 |
A rivet is unthreaded, headed pin used to join two parts by passing the pin through holes in the parts and then forming a second head in the pin on th...
|
Capacity : 108000 MT/Annum |
Plant and Machinery cost: 17 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 40.00 |
|
Break Even Point (BEP): 62.00 |
TCI : Cost of Project : 78 Million |
|
Cost of Project : 0 |
The Indian Steel Industry is almost 100 years old now. Steel industry in India is on an upswing because of the strong global and domestic demand. Indi...
|
Capacity : 150000 MT HR SS Coil/Annum, 150000 MT CR SS Coil/Annum |
Plant and Machinery cost: 1100 Crores |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 39.00 |
TCI : Cost of Project : 1402 Crores |
|
Cost of Project : 0 |
Steel is the most widely used material in a large variety of applications both simple and sophisticated. Steel is produced through two process routes;...
|
Capacity : 1020000 MT/Annum Steel Round Section |
Plant and Machinery cost: 987 Crores |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 54.00 |
TCI : Cost of Project : 1175 Crores |
|
Cost of Project : 0 |
The indigenous Ferro Alloy production has started only in 1943 with the advent of the setting up of two 1500 KVA capacity furnaces by Mysore Iron and...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
The juice of fresh vegetables is the richest available food sources of vitamins, minerals & enzymes. Usually we just cannot eat enough raw vegetables...
|
Capacity : 12000 Bottles/Day |
Plant and Machinery cost: 129 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 52.00 |
|
Break Even Point (BEP): 33.00 |
TCI : 484 Lakhs |
|
Cost of Project : 0 |
The primary objective of the study is to review the technological status of ferroalloys industry in the country in the area of bulk production of sil...
|
Capacity : 12 MT/Day, Ferro Manganese –6 MT/Day, Silico Manganese 3 MT/Day, Ferro Silicon 3 MT/Day |
Plant and Machinery cost: 75 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 36.00 |
|
Break Even Point (BEP): 79.00 |
TCI : Cost of Project : 242 Lakhs |
|
Cost of Project : 0 |
Most bacteria, yeasts and molds are difficult to remove from food surfaces. Washing fresh food reduces their numbers only slightly. Peeling root crops...
|
Capacity : 12000 Cans/Day(Chopped Tomatoes, Cheeked Beans, Mushrooms) |
Plant and Machinery cost: 67 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 32.00 |
TCI : 549 Lakhs |
|
Cost of Project : 0 |
Every person needs good health and for good health we want good things for care of our health. To attain good health it is essential to follow good nu...
|
Capacity : 5 MT/annum |
Plant and Machinery cost: 170 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 47.00 |
|
Break Even Point (BEP): 30.00 |
TCI : 2542 Lakhs |
|
Cost of Project : 0 |
Ferrosilicon, or ferrosilicium, is a ferroalloy an alloy of iron and silicon with between 15 and 90% silicon. It contains a high proportion of iron s...
|
Capacity : 3000 MT/Annum |
Plant and Machinery cost: 243 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 63.00 |
TCI : Cost of Project : 816 Lakhs |
|
Cost of Project : 0 |
Steel is a generic name for a group of ferrous metals which due to their abundance durability versatility and low cost are most useful metallic materi...
|
Capacity : 90000 MT/year |
Plant and Machinery cost: 477 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project : 1738 lakhs |
|
Cost of Project : 0 |