Please choose a project below related to this category.
Ready mix concrete is a modern trend of introduction in the Asian Countries. It is already introduced long before in the European Countries. It is new...
|
Capacity : 240 Cu MT/Day |
Plant and Machinery cost: Rs 320 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.08 |
|
Break Even Point (BEP): 46.09 |
TCI : Cost of Project: Rs. 773 Lakhs |
|
Cost of Project : 77300000 |
Autoclaved Aerated Concrete (AAC) is a non-combustible, lime-based cementitious building material that is expanding into new worldwide markets. As a s...
|
Capacity : 500 CUM/Day |
Plant and Machinery cost: Rs.1117 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 36.00 |
|
Break Even Point (BEP): 39.00 |
TCI : Cost Of Project : Rs. 1886 Lakhs |
|
Cost of Project : 188600000 |
Guar gum, a natural gum, is an edible thickening agent extracted from the guar bean. Guar beans have a large endosperm which contains galactomannan g...
|
Capacity : 10 MT/Day |
Plant and Machinery cost: Rs.213 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 46.00 |
TCI : Cost Of Project : Rs.832 Lakhs |
|
Cost of Project : 83200000 |
A lubricant is a substance introduced to reduce friction between moving surfaces. It may also have the function of transporting foreign particles. The...
|
Capacity : - |
Plant and Machinery cost: Rs. 274 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 40.00 |
TCI : Cost of Project : Rs.1330 Lakhs |
|
Cost of Project : 133000000 |
Cellular light weight concrete is also known as CLC, foamed cement, and light weight cement, world over thanks to its advantages over ordinary buildin...
|
Capacity : 50 Cu Mtr/Day |
Plant and Machinery cost: Rs.127 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 16.00 |
|
Break Even Point (BEP): 57.00 |
TCI : Cost of Project : Rs.413 Lakhs |
|
Cost of Project : 41300000 |
Starch (C6H10O5)n, the principal reserve poly Saccharide in plants constitutes substantial portion of human diet. It is the principal components of mo...
|
Capacity : 80 MT/day |
Plant and Machinery cost: Rs.358 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 36.00 |
|
Break Even Point (BEP): 45.00 |
TCI : Cost of Project : Rs.737 Lakhs |
|
Cost of Project : 73700000 |
A lubricant is a substance introduced to reduce friction between moving surfaces. It may also have the function of transporting foreign particl...
|
Capacity : 25 Million Ltrs./Annum |
Plant and Machinery cost: Rs. 487 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 44.00 |
TCI : Cost of Project : Rs. 1557 Lakhs |
|
Cost of Project : 155700000 |
Sorbitol is one of many sugar alcohols found in nature that gets metabolized slower in our bodies than other normal dietary sugars. Also known as gluc...
|
Capacity : 47 MT/Day |
Plant and Machinery cost: Rs. 869 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 41.00 |
TCI : Cost of Project : Rs. 1235 Lakhs |
|
Cost of Project : 123500000 |
Maize is third important cereal/crop after wheat and rice and has a great potential of processing due to its high nutritive value and commercial uses....
|
Capacity : - |
Plant and Machinery cost: Rs.1029 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 52.00 |
|
Break Even Point (BEP): 30.00 |
TCI : Cost of Project : Rs.2807 Lakhs |
|
Cost of Project : 280700000 |
Maize (Zea mays) is classified into dent, flint, waxy, sweet and pop corn categories. Dent corn also known as field corn, containing both hard and so...
|
Capacity : - |
Plant and Machinery cost: Rs.145 Crores |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 31.00 |
TCI : Cost of Project : Rs.213 Crores |
|
Cost of Project : 2130000000 |
Aluminium Conductors (i) All Aluminium Conductors (AAC) (ii) All Alloy Aluminium Conductors (AAAC), and (iii) Aluminium Conductors Steel Reinforced (A...
|
Capacity : 4 MT/Day |
Plant and Machinery cost: 93 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 37.00 |
|
Break Even Point (BEP): 37.00 |
TCI : Cost of Project : 393 Lakhs |
|
Cost of Project : 39300000 |
Aluminum is the most widely used non ferrous metal and is extensively used in packaging materials. It is an excellent material for creating all types...
|
Capacity : 147,5000 NOS./day |
Plant and Machinery cost: 55 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 53.00 |
|
Break Even Point (BEP): 21.00 |
TCI : 2018 Lakhs |
|
Cost of Project : 0 |