Autoclaved Aerated Concrete (AAC) is a non combustible, lime based, cementitious building material that is expanding into new worldwide markets. As a...
|
Capacity : 150000 M3/Annum |
Plant and Machinery cost: 1100 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 53.00 |
TCI : Cost of Project : 1790 Lakhs |
|
Cost of Project : 0 |
Engine oil, Transformer oil and hydraulic oil all are special grade petroleum oils, which had different specific gravity and viscosity. When these spe...
|
Capacity : - |
Plant and Machinery cost: 103 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 24.00 |
|
Break Even Point (BEP): 54.00 |
TCI : 303 Lakhs |
|
Cost of Project : 0 |
Cement industry forms a vital part of infrastructure development since no modern construction activity can take place without the use of cement in one...
|
Capacity : 1800000 Nos. Cement Bags (50 Kg. each) |
Plant and Machinery cost: 1296 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 47.00 |
TCI : Cost of Project : 1750 Lakhs |
|
Cost of Project : 175000000 |
Starch is a group of polysaccharides, composed of glucopyranose units joined together by glucosidric linkages. It conforms to the molecular formula, (...
|
Capacity : - |
Plant and Machinery cost: 780 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project : 2590 Lakhs |
|
Cost of Project : 0 |
The aluminium industry can be categorized into two principal segments. The key segment is the production of primary aluminium by integrated producers...
|
Capacity : 25000 MT/Annum |
Plant and Machinery cost: 280 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 72.00 |
TCI : Cost of Project : 2815 Lakhs |
|
Cost of Project : 0 |
Starch occurs naturally in the plants and its percentage varies with the plant and also in different parts of the same plant. Corn (maize), sorghum, g...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Asphalt is a humid, black and extremely thick liquid or semi solid that exists in most crude petroleum and also in a few natural deposits. Asphalt con...
|
Capacity : 384000 MT/Annum Asphalt Mix |
Plant and Machinery cost: 121 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 51.00 |
|
Break Even Point (BEP): 26.00 |
TCI : 565 Lakhs |
|
Cost of Project : 0 |
Maize is one of the main cereal grains which is produced throughout India and is placed 3rd position in agricultural base production though it is not...
|
Capacity : - |
Plant and Machinery cost: 179 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 59.00 |
TCI : Cost of Project : 543 Lakhs |
|
Cost of Project : 0 |
7 ACA or 7 Aminocephalosporanic acid is made from Cephalosporin C and is a key intermediate for synthesizing cephalosporin antibiotics, the B lactam...
|
Capacity : 150 MT/Annum |
Plant and Machinery cost: 1486 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 64.00 |
|
Break Even Point (BEP): 42.00 |
TCI : Cost of Project : 2167 Lakhs |
|
Cost of Project : 0 |
Maize (Zea mays L) is one of the most important cereals of the world and provides more human food than any other cereal. Starch is a group of polysacc...
|
Capacity : - |
Plant and Machinery cost: 780 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project : 2590 Lakhs |
|
Cost of Project : 0 |
The advent of thermo mechanically treated (TMT) steel bars has heralded a new era of economy in the construction industry in India. Round plain steel...
|
Capacity : 144000 MT/Annum |
Plant and Machinery cost: 332 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 76.00 |
TCI : Cost of Project : 1949 Lakhs |
|
Cost of Project : 0 |
Metal Fabrication is the group of entire processes employed to shape the metals into the desired shape by welding, brazing, soldering or riveting, bol...
|
Capacity : - |
Plant and Machinery cost: 47 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 64.00 |
TCI : Cost of Project : 158 Lakhs |
|
Cost of Project : 0 |