Please choose a project below related to this category.
Starches are modified to enhance their performance in different applications. Starches may be modified to increase their stability against excessive h...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Sorbitol, a polyol (sugar alcohol), is a bulk sweetener. Sorbitol is produced either from starch hydrolysates, from dextrose syrup, or from dextrose m...
|
Capacity : 40.0 Tonnes/Day |
Plant and Machinery cost: 1 |
|
Working Capital : 0 |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 1.00 |
TCI : 1 |
|
Cost of Project : 0 |
The most commonly used cement in the world is Portland cement, which is formed at high temperatures that chemically combine the ingredients into new c...
|
Capacity : 75000 MT/Annum |
Plant and Machinery cost: 433 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 58.00 |
TCI : Cost of Project : 727 Lakhs |
|
Cost of Project : 72700000 |
Lube oil is a substance (often a liquid) introduced between two moving surfaces to reduce the friction between them, improving efficiency and reducing...
|
Capacity : 15000 Kls./Annum |
Plant and Machinery cost: 142 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 51.00 |
TCI : Cost of Project : 804 Lakhs |
|
Cost of Project : 0 |
The chief departments of a metallurgical plant operating on a complete ore-to-finished product cycle are the blast furnace, steel making and rolling d...
|
Capacity : - |
Plant and Machinery cost: 429 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 61.00 |
TCI : Cost of Project : 1145 Lakhs |
|
Cost of Project : 0 |
The 20th century has seen the emergence of aluminium as a key industrial and strategic material, second to only steel in terms of importance and tonna...
|
Capacity : 21600 MT/Annum |
Plant and Machinery cost: 410 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 63.00 |
TCI : Cost of Project : 2020 Lakhs |
|
Cost of Project : 0 |
The term cement is used to designate many different kinds of substances that are used as binders. The term cements as used henceforth will be confined...
|
Capacity : 90,000 MT/Annum |
Plant and Machinery cost: 1296 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 47.00 |
TCI : Cost of Project : 1750 Lakhs |
|
Cost of Project : 175000000 |
GOOD SCOPE FOR ALUMINIUM EXTRUSION PLANT Extrusion is a process equally suitable for the simplest shapes and for the most complex for the wide range...
|
Capacity : 2400 MT/Annum |
Plant and Machinery cost: 318 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 58.00 |
TCI : Cost of Project : 738 Lakhs |
|
Cost of Project : 0 |
Copper wire is an essential material for electrical cables and motor and transformer winding. Copper wire is available in different gauges (42 gauges...
|
Capacity : 150 MT/Annum |
Plant and Machinery cost: 69 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 42.00 |
TCI : 167 Lakhs |
|
Cost of Project : 0 |
Bauxite ore is an important mineral used in producing alumina, the raw material that is in turn used for producing aluminum. Approximately 85% of Baux...
|
Capacity : 19998 MT/Annum Pure Alumina from Bauxite |
Plant and Machinery cost: 671 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 48.00 |
TCI : Cost of Project : 2113 Lakhs |
|
Cost of Project : 0 |
Maize provides nutrients for humans and animals and serves as a basic raw material for the production of starch, oil and protein, alcoholic beverages,...
|
Capacity : - |
Plant and Machinery cost: 238 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 33.00 |
|
Break Even Point (BEP): 60.00 |
TCI : Cost of Project : 697 Lakhs |
|
Cost of Project : 0 |
Ready mix concrete is a modern trend of introduction in the Asian Countries. It is already introduced long before in the European Countries. It is new...
|
Capacity : 240 Cubic Meter/Day |
Plant and Machinery cost: 86 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 36.00 |
TCI : 936 Lakhs |
|
Cost of Project : 0 |