Please choose a project below related to this category.
Starch occurs naturally in the plants and its percentage varies with the plant and also in different parts of the same plant. Corn (maize), sorghum, g...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Asphalt is a humid, black and extremely thick liquid or semi solid that exists in most crude petroleum and also in a few natural deposits. Asphalt con...
|
Capacity : 384000 MT/Annum Asphalt Mix |
Plant and Machinery cost: 121 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 51.00 |
|
Break Even Point (BEP): 26.00 |
TCI : 565 Lakhs |
|
Cost of Project : 0 |
Maize is one of the main cereal grains which is produced throughout India and is placed 3rd position in agricultural base production though it is not...
|
Capacity : - |
Plant and Machinery cost: 179 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 59.00 |
TCI : Cost of Project : 543 Lakhs |
|
Cost of Project : 0 |
7 ACA or 7 Aminocephalosporanic acid is made from Cephalosporin C and is a key intermediate for synthesizing cephalosporin antibiotics, the B lactam...
|
Capacity : 150 MT/Annum |
Plant and Machinery cost: 1486 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 64.00 |
|
Break Even Point (BEP): 42.00 |
TCI : Cost of Project : 2167 Lakhs |
|
Cost of Project : 0 |
Maize (Zea mays L) is one of the most important cereals of the world and provides more human food than any other cereal. Starch is a group of polysacc...
|
Capacity : - |
Plant and Machinery cost: 780 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project : 2590 Lakhs |
|
Cost of Project : 0 |
The advent of thermo mechanically treated (TMT) steel bars has heralded a new era of economy in the construction industry in India. Round plain steel...
|
Capacity : 144000 MT/Annum |
Plant and Machinery cost: 332 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 76.00 |
TCI : Cost of Project : 1949 Lakhs |
|
Cost of Project : 0 |
Metal Fabrication is the group of entire processes employed to shape the metals into the desired shape by welding, brazing, soldering or riveting, bol...
|
Capacity : - |
Plant and Machinery cost: 47 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 64.00 |
TCI : Cost of Project : 158 Lakhs |
|
Cost of Project : 0 |
Starches are modified to enhance their performance in different applications. Starches may be modified to increase their stability against excessive h...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Sorbitol, a polyol (sugar alcohol), is a bulk sweetener. Sorbitol is produced either from starch hydrolysates, from dextrose syrup, or from dextrose m...
|
Capacity : 40.0 Tonnes/Day |
Plant and Machinery cost: 1 |
|
Working Capital : 0 |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 1.00 |
TCI : 1 |
|
Cost of Project : 0 |
The most commonly used cement in the world is Portland cement, which is formed at high temperatures that chemically combine the ingredients into new c...
|
Capacity : 75000 MT/Annum |
Plant and Machinery cost: 433 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 58.00 |
TCI : Cost of Project : 727 Lakhs |
|
Cost of Project : 72700000 |
Lube oil is a substance (often a liquid) introduced between two moving surfaces to reduce the friction between them, improving efficiency and reducing...
|
Capacity : 15000 Kls./Annum |
Plant and Machinery cost: 142 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 51.00 |
TCI : Cost of Project : 804 Lakhs |
|
Cost of Project : 0 |
The chief departments of a metallurgical plant operating on a complete ore-to-finished product cycle are the blast furnace, steel making and rolling d...
|
Capacity : - |
Plant and Machinery cost: 429 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 61.00 |
TCI : Cost of Project : 1145 Lakhs |
|
Cost of Project : 0 |