Please choose a project below related to this category.
7 ACA or 7 Aminocephalosporanic acid is made from Cephalosporin C and is a key intermediate for synthesizing cephalosporin antibiotics, the B lactam...
|
Capacity : 150 MT/Annum |
Plant and Machinery cost: 1486 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 64.00 |
|
Break Even Point (BEP): 42.00 |
TCI : Cost of Project : 2167 Lakhs |
|
Cost of Project : 0 |
Maize (Zea mays L) is one of the most important cereals of the world and provides more human food than any other cereal. Starch is a group of polysacc...
|
Capacity : - |
Plant and Machinery cost: 780 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project : 2590 Lakhs |
|
Cost of Project : 0 |
The advent of thermo mechanically treated (TMT) steel bars has heralded a new era of economy in the construction industry in India. Round plain steel...
|
Capacity : 144000 MT/Annum |
Plant and Machinery cost: 332 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 76.00 |
TCI : Cost of Project : 1949 Lakhs |
|
Cost of Project : 0 |
Metal Fabrication is the group of entire processes employed to shape the metals into the desired shape by welding, brazing, soldering or riveting, bol...
|
Capacity : - |
Plant and Machinery cost: 47 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 64.00 |
TCI : Cost of Project : 158 Lakhs |
|
Cost of Project : 0 |
Starches are modified to enhance their performance in different applications. Starches may be modified to increase their stability against excessive h...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Sorbitol, a polyol (sugar alcohol), is a bulk sweetener. Sorbitol is produced either from starch hydrolysates, from dextrose syrup, or from dextrose m...
|
Capacity : 40.0 Tonnes/Day |
Plant and Machinery cost: 1 |
|
Working Capital : 0 |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 1.00 |
TCI : 1 |
|
Cost of Project : 0 |
The most commonly used cement in the world is Portland cement, which is formed at high temperatures that chemically combine the ingredients into new c...
|
Capacity : 75000 MT/Annum |
Plant and Machinery cost: 433 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 58.00 |
TCI : Cost of Project : 727 Lakhs |
|
Cost of Project : 72700000 |
Lube oil is a substance (often a liquid) introduced between two moving surfaces to reduce the friction between them, improving efficiency and reducing...
|
Capacity : 15000 Kls./Annum |
Plant and Machinery cost: 142 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 51.00 |
TCI : Cost of Project : 804 Lakhs |
|
Cost of Project : 0 |
The chief departments of a metallurgical plant operating on a complete ore-to-finished product cycle are the blast furnace, steel making and rolling d...
|
Capacity : - |
Plant and Machinery cost: 429 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 61.00 |
TCI : Cost of Project : 1145 Lakhs |
|
Cost of Project : 0 |
The 20th century has seen the emergence of aluminium as a key industrial and strategic material, second to only steel in terms of importance and tonna...
|
Capacity : 21600 MT/Annum |
Plant and Machinery cost: 410 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 63.00 |
TCI : Cost of Project : 2020 Lakhs |
|
Cost of Project : 0 |
The term cement is used to designate many different kinds of substances that are used as binders. The term cements as used henceforth will be confined...
|
Capacity : 90,000 MT/Annum |
Plant and Machinery cost: 1296 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 47.00 |
TCI : Cost of Project : 1750 Lakhs |
|
Cost of Project : 175000000 |
GOOD SCOPE FOR ALUMINIUM EXTRUSION PLANT Extrusion is a process equally suitable for the simplest shapes and for the most complex for the wide range...
|
Capacity : 2400 MT/Annum |
Plant and Machinery cost: 318 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 58.00 |
TCI : Cost of Project : 738 Lakhs |
|
Cost of Project : 0 |