Please choose a project below related to this category.
Sorbitol is a water soluble polyhydric alcohol, having sweet taste and high stability besides properties of humectancy and plastisizing used in manuf...
|
Capacity : 35 MT/Day, 15 MT Sorbitol, 5 MT Maltitol, 10 MT Dextrose Anhydrous, 5 MT/Day Vitamin C |
Plant and Machinery cost: 607 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 39.00 |
|
Break Even Point (BEP): 39.00 |
TCI : 2332 Lakhs |
|
Cost of Project : 0 |
-
|
Capacity : 200 Ton/Annum |
Plant and Machinery cost: Rs. 4 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 52.00 |
|
Break Even Point (BEP): 32.00 |
TCI : Rs. 45 Lakhs |
|
Cost of Project : 0 |
This is hardly a family in India where glittering aluminium utensils occupy significant place. Aluminium utensils of domestic use are of three broad c...
|
Capacity : 900 MT/Annum |
Plant and Machinery cost: 43 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 65.00 |
TCI : Cost of Project : 146 Lakhs |
|
Cost of Project : 0 |
-
|
Capacity : 3000 MT/Annum |
Plant and Machinery cost: Rs. 332 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 50.00 |
TCI : Cost of Project : Rs. 533 Lakhs |
|
Cost of Project : 0 |
Steel is a generic name for a group of ferrous metals due to their abundance, durability, versatility and low cost, are most useful metallic material...
|
Capacity : 480 M.T/day |
Plant and Machinery cost: 332 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 76.00 |
TCI : Cost of Project: 1949 Lakhs |
|
Cost of Project : 0 |
Starch is a group of polysaccharides, composed of glucopyranose units joined together by-glucosidric linkages. It conforms to the molecular formula, (...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
The forging industry as it known today, make use of various type of forging equipments for the practical duplication of forged part for commercial use...
|
Capacity : 6 MT / Day |
Plant and Machinery cost: 217 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 63.00 |
TCI : Cost of Project : 435 Lakhs |
|
Cost of Project : 0 |
Roofs are basic element of shelter to protect the people themselves from cold, wind rain and sun. Tiles are thin slabs of baked clay used for constru...
|
Capacity : 5000 Nos. /Day |
Plant and Machinery cost: 39 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 43.00 |
TCI : 163 Lakhs |
|
Cost of Project : 0 |
-
|
Capacity : 66.66 MT/Day |
Plant and Machinery cost: Rs. 671 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 38.00 |
TCI : Rs. 2112 Lakhs |
|
Cost of Project : 0 |
Wheat starch is produced from wheat species such as Triticum aestivum, which is also known as bread wheat. Starch is one of the main carbohydrate in w...
|
Capacity : 1.0 Ton/Day (Gluten), 16.66 MT Wheat Starch /Day |
Plant and Machinery cost: Rs. 100 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 24.00 |
|
Break Even Point (BEP): 58.00 |
TCI : Rs. 350 Lakhs |
|
Cost of Project : 0 |
Thermo Mechanical Treatment (TMT) process for reinforcement bars is opening up new vistas in composite RCC, the re-enforcing steel is the costliest c...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Aluminium is most abundant metallic element is used on earth. Various section of aluminium is used in building are rods, wires, channel etc are the st...
|
Capacity : 1500 MT /Year |
Plant and Machinery cost: 145 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 38.00 |
|
Break Even Point (BEP): 73.00 |
TCI : Cost of Project : 415 Lakhs |
|
Cost of Project : 0 |