Please choose a project below related to this category.
Profile Copper powder is finely granulated copper that has many metallurgic functions. The powder is cheaper than regular cast copper, so engineers c...
|
Capacity : 2 MT/ day |
Plant and Machinery cost: 27 Lakh |
|
Working Capital : - |
Rate of Return (ROR): 50.00 |
|
Break Even Point (BEP): 29.70 |
TCI : 792 Lakh |
|
Cost of Project : 0 |
Profile Maize is one of the cereal grains which produces throughout India and is placed 3rd position in agricultural base production. The products fr...
|
Capacity : - |
Plant and Machinery cost: 216 Lakh |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 57.00 |
TCI : Cost of the Project : 630 Lakh |
|
Cost of Project : 63000000 |
Profile Polymer modified adhesives are widely accepted in the industry and often referred to as thin-set mortars. The blended polymers interact with...
|
Capacity : White Cement Tile Adhesive – 1500 MT/Annum,Ordinary Portland Cement Tile Adhesive – 1500 MT/Annum |
Plant and Machinery cost: 106 Lakh |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 55.00 |
TCI : Cost of Project : 420 Lakh |
|
Cost of Project : 42000000 |
Profile Rolling allows sheet metal to be formed in to cylindrical shapes. This gives us the ability to make tanks, cylinders, bands and virtually any...
|
Capacity : 9000 MT SS Rolled Sheet/Annum,4500000 No.s of Set SS Utensils/Annum |
Plant and Machinery cost: 3642 Lakh |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 49.00 |
TCI : Cost of Project : 6391 Lakh |
|
Cost of Project : 639100000 |
Profile Maize is third important cereal/crop after wheat and rice and has a great potential of processing due to its high nutritive value and commerc...
|
Capacity : - |
Plant and Machinery cost: 2531 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 44.00 |
TCI : Cost of project : 4639 Lakhs |
|
Cost of Project : 463900000 |
Profile: A fastener is a hardware device that mechanically joins or affixes two or more objects together. Fasteners mainly cover nuts, bolts, screws,...
|
Capacity : 2400 MT/Annum |
Plant and Machinery cost: 120 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 59.00 |
TCI : Cost of project: 417 Lakhs |
|
Cost of Project : 41700000 |
Profile: Coconuts are the fruit of the coconut palm, botanically known as cocos nucifera, nucifera with meaning "nut-bearing." Coconut is one of the...
|
Capacity : - |
Plant and Machinery cost: 770 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 64.00 |
TCI : Cost of project : 1930 Lakhs |
|
Cost of Project : 193000000 |
PRODUCT PROFILE The maize also called "Corn or Indian Corn" is widely cultivated in India; Maize ranks high among the four or five principal cereal c...
|
Capacity : - |
Plant and Machinery cost: 3175 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 33.00 |
|
Break Even Point (BEP): 40.00 |
TCI : 7310 Lakhs |
|
Cost of Project : 0 |
PRODUCT PROFILE Potato starch is starch extracted from potatoes. The cells of the root tubers of the potato plant contain starch grains (leucoplasts)...
|
Capacity : 45000 MT/Annum |
Plant and Machinery cost: 654 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 50.00 |
TCI : Cost of the project: 1618 Lakhs |
|
Cost of Project : 161800000 |
PRODUCT PROFILE Liquefied Petroleum Gas is a Propane/Butane mixture liquefied under normal ambient temperature and moderate pressures. It is a safe...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
PRODUCT PROFILE Concrete is a composite construction material composed primarily of aggregate, cement and water. Concrete is widely used for making a...
|
Capacity : 2400000 NO.s Concrete blocks /Annum, 49000 Cubic metre Ready mix concrete/Annum, |
Plant and Machinery cost: 1068 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 42.00 |
TCI : Cost of project: 1477 Lakhs |
|
Cost of Project : 147700000 |
The manufacture of standard commercial graphite as generally practiced in industry differs greatly from that of metals since graphite has no distinct...
|
Capacity : High Grade Pitch 35400 MT/Annum |
Plant and Machinery cost: 875 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 49.00 |
TCI : Cost of Project : 1447 Lakhs |
|
Cost of Project : 144700000 |