Please choose a project below related to this category.
Wheat is a grass, originally from the Fertile Crescent regions, but now cultivated worldwide. In 2007 world production of wheat was 607 million tons w...
|
Capacity : 30000 MT/Annum |
Plant and Machinery cost: 240 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 63.00 |
TCI : Cost of Project : 736 Lakhs |
|
Cost of Project : 0 |
Steel is said to be the backbone of any national economy, because most of industries greatly depend on the use of iron and steel for structural purpos...
|
Capacity : 6000 MT/Annum |
Plant and Machinery cost: 392 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 62.00 |
TCI : Cost of Project : 675 Lakhs |
|
Cost of Project : 0 |
Copper wire is an essential material for electrical cables, motors and transformer winding. Copper wire is available in different gauges. The gauge of...
|
Capacity : 6300 MT/Annum |
Plant and Machinery cost: 190 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 53.00 |
TCI : Cost of Project : 1126 Lakhs |
|
Cost of Project : 0 |
Butt welded steel pipe fittings are extensively used in a piping system to change direction or function which is mechanically used to the system. The...
|
Capacity : 1500 MT Steel Fittings & Flanges/Annum |
Plant and Machinery cost: 705 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 59.00 |
TCI : Cost of Project : 1178 Lakhs |
|
Cost of Project : 0 |
Autoclaved Aerated Concrete (AAC) is a non combustible, lime based, cementitious building material that is expanding into new worldwide markets. As a...
|
Capacity : 150000 M3/Annum |
Plant and Machinery cost: 1100 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 53.00 |
TCI : Cost of Project : 1790 Lakhs |
|
Cost of Project : 0 |
Engine oil, Transformer oil and hydraulic oil all are special grade petroleum oils, which had different specific gravity and viscosity. When these spe...
|
Capacity : - |
Plant and Machinery cost: 103 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 24.00 |
|
Break Even Point (BEP): 54.00 |
TCI : 303 Lakhs |
|
Cost of Project : 0 |
Cement industry forms a vital part of infrastructure development since no modern construction activity can take place without the use of cement in one...
|
Capacity : 1800000 Nos. Cement Bags (50 Kg. each) |
Plant and Machinery cost: 1296 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 47.00 |
TCI : Cost of Project : 1750 Lakhs |
|
Cost of Project : 175000000 |
Starch is a group of polysaccharides, composed of glucopyranose units joined together by glucosidric linkages. It conforms to the molecular formula, (...
|
Capacity : - |
Plant and Machinery cost: 780 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project : 2590 Lakhs |
|
Cost of Project : 0 |
The aluminium industry can be categorized into two principal segments. The key segment is the production of primary aluminium by integrated producers...
|
Capacity : 25000 MT/Annum |
Plant and Machinery cost: 280 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 72.00 |
TCI : Cost of Project : 2815 Lakhs |
|
Cost of Project : 0 |
Starch occurs naturally in the plants and its percentage varies with the plant and also in different parts of the same plant. Corn (maize), sorghum, g...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Asphalt is a humid, black and extremely thick liquid or semi solid that exists in most crude petroleum and also in a few natural deposits. Asphalt con...
|
Capacity : 384000 MT/Annum Asphalt Mix |
Plant and Machinery cost: 121 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 51.00 |
|
Break Even Point (BEP): 26.00 |
TCI : 565 Lakhs |
|
Cost of Project : 0 |
Maize is one of the main cereal grains which is produced throughout India and is placed 3rd position in agricultural base production though it is not...
|
Capacity : - |
Plant and Machinery cost: 179 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 59.00 |
TCI : Cost of Project : 543 Lakhs |
|
Cost of Project : 0 |