Please choose a project below related to this category.
Goats are allied to sheep but are much hardier and more active animals. Their males or billy goats have a tuft of hair (beards) under the chin. The pr...
|
Capacity : 20000 MT Milk/Annum |
Plant and Machinery cost: 2 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 55.00 |
|
Break Even Point (BEP): 38.00 |
TCI : 37 Lakhs |
|
Cost of Project : 0 |
Residual rocks, in which the alumina trihydrate and monohydrate minerals gibbsite, boehmite, and diaspore predominate are classified as bauxite. Other...
|
Capacity : 20000 MT/Annum |
Plant and Machinery cost: 615 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 17.00 |
|
Break Even Point (BEP): 54.00 |
TCI : 1875 Lakhs |
|
Cost of Project : 0 |
Anodic Aluminium Labels used as an industrial, metallic labels and are widely used on industrial machinery and domestic appliances for supplying the s...
|
Capacity : 1 MT/Day |
Plant and Machinery cost: 13 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 34.00 |
TCI : 132 Lakhs |
|
Cost of Project : 0 |
Prestressing is the process of applying a load to a structure deforming, so that it will withstand a work load more effectively or deflect less. Prest...
|
Capacity : 500 Nos./Day |
Plant and Machinery cost: 144 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 56.00 |
|
Break Even Point (BEP): 37.00 |
TCI : 514 Lakhs |
|
Cost of Project : 0 |
The American petroleum industry had its inception when the now famous drake well was drilled in the year 1859. The ratio of proven reserves to produc...
|
Capacity : 200000 Cube Meter/Day |
Plant and Machinery cost: US $ 273.3 Million |
|
Working Capital : |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 12.00 |
TCI : US $ 3083 Million |
|
Cost of Project : 0 |
To think of steel first of all a rod or a bar as you may call it comes to the mind of a common man in India. Steel rods are required even for making...
|
Capacity : 500 MT/Day |
Plant and Machinery cost: 39 Crores |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 44.00 |
TCI : 145 Crores |
|
Cost of Project : 0 |
Hot dip galvanizing is a process in which an adherent, protective coating of zinc compounds is developed on the surface of iron and steel products by...
|
Capacity : 12 MT/Day |
Plant and Machinery cost: RS. 176 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 53.00 |
|
Break Even Point (BEP): 48.00 |
TCI : Rs. 859 Lakhs |
|
Cost of Project : 0 |
The general outlook for the cement industry is fulfilled the situation in a large body of Indian Industry, with a market rise in production failing to...
|
Capacity : 500 MT/Day OR 10,000 BAGS/DAY |
Plant and Machinery cost: Rs. 476.00 Lakhs |
|
Working Capital : 606 Lacs |
Rate of Return (ROR): 68.00 |
|
Break Even Point (BEP): 35.00 |
TCI : 1307 Lacs |
|
Cost of Project : 0 |
The general outlook for the cement industry is fulfilled the situation in a large body of Indian Industry, with a market rise in production failing to...
|
Capacity : 500 MT/Day OR 10,000 BAGS/DAY |
Plant and Machinery cost: Rs. 476.00 Lakhs |
|
Working Capital : Rs. 606 Lacs |
Rate of Return (ROR): 68.00 |
|
Break Even Point (BEP): 35.00 |
TCI : Rs. 1307 Lacs |
|
Cost of Project : 0 |
Aluminium is an abundant metal and is readily available at a very stable price. Aluminium foil is being produced and converted on the most modern mach...
|
Capacity : 50000 Nos./day |
Plant and Machinery cost: 131 Lacs |
|
Working Capital : 139 Lacs |
Rate of Return (ROR): 31.00 |
|
Break Even Point (BEP): 49.00 |
TCI : - |
|
Cost of Project : 0 |
In the manufacture of steel, chromium is added usually in the form of ferro chrome. Pure chromium metal, produced by electrolytic or aluminothermic pr...
|
Capacity : - |
Plant and Machinery cost: 2998 Lacs |
|
Working Capital : - |
Rate of Return (ROR): 34.00 |
|
Break Even Point (BEP): 76.00 |
TCI : 4490 Lacs |
|
Cost of Project : 0 |
Oxygen (CO2, gas at 00/1 matm., 1.429g./l, crit. Pressure, 49.7 Matm.) is a colorless, odourless, and tasteless gas, somewhat heavier than air. It is...
|
Capacity : 1440 Cubie Meter/Day |
Plant and Machinery cost: 50 Lacs |
|
Working Capital : 18 Lacs |
Rate of Return (ROR): 18.19 |
|
Break Even Point (BEP): 75.00 |
TCI : 101 Lacs |
|
Cost of Project : 0 |