Please choose a project below related to this category.
Casting is the oldest form of metal shaping and is still the basic engineering process since most metals are melted and cast from ores. Casting are ma...
|
Capacity : 1200 MT/Annum |
Plant and Machinery cost: 132 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 39.00 |
|
Break Even Point (BEP): 67.00 |
TCI : Cost of Project Rs. 262 Lakhs |
|
Cost of Project : 26200000 |
Mill and straw boards are thicker, heavier and less flexible than the convention paper. The thickness of board is the thickness of a single sheet boar...
|
Capacity : 5 MT/day |
Plant and Machinery cost: Rs. 39 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 38.00 |
TCI : Rs.169 lakhs |
|
Cost of Project : 0 |
The term ˜plywood covers a form of laminated caves in which successive layers of veneer are ordinarily cross laminated, the care of which may be venee...
|
Capacity : 23333 SQM/day |
Plant and Machinery cost: Rs. 43 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 50.00 |
|
Break Even Point (BEP): 44.00 |
TCI : Rs. 404 lakhs |
|
Cost of Project : 0 |
Piping may represent as much as 25 percent of the cost of a chemical-process plant. The installed cost of piping systems varies widely with the materi...
|
Capacity : 1500 MT / Annum Tubes, 600 MT/Annum Fittings |
Plant and Machinery cost: 554 Lakhs |
|
Working Capital : |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 48.00 |
TCI : Cost of Project : 752 Lakhs |
|
Cost of Project : 0 |
Natural fireclays were the raw materials for the first refractories. Their usefulness in this respect is founded on the high proportion of clay minera...
|
Capacity : 15000 MT / Annum |
Plant and Machinery cost: 145 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 36.00 |
TCI : Cost of Project : 370 Lakhs |
|
Cost of Project : 37000000 |
Engine oil becomes contaminated with foreign material in service. In circulating systems, where a substantial quantity of oil is involved, it is desir...
|
Capacity : 1 MT/day |
Plant and Machinery cost: Rs. 20 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 41.00 |
TCI : Rs. 100 Lakhs |
|
Cost of Project : 0 |
A lifting hook comprising a suspension part fitted with a suspension shaft, which supports a hook part provided with a slot. A safety latch is pivotal...
|
Capacity : 5 MT/day |
Plant and Machinery cost: Rs. 57 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 48.00 |
|
Break Even Point (BEP): 33.00 |
TCI : Rs. 352 lakhs |
|
Cost of Project : 0 |
Steel is considered to be the strongest material in that price. Day to day life and growth of industry and infrastructure in any country totally depen...
|
Capacity : 5000 MT/Day |
Plant and Machinery cost: Rs. 156 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 52.00 |
|
Break Even Point (BEP): 21.00 |
TCI : Rs. 2396 lakhs |
|
Cost of Project : 0 |
The production of G.I. Wire from H.B. wire is not complicated. In case of H.B. wire drawing from H.B. bars, certain mechanical process is used. An imp...
|
Capacity : 8.00 MT./day |
Plant and Machinery cost: Rs. 70 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 32.00 |
TCI : Rs. 419 lakhs |
|
Cost of Project : 0 |
Bulk petroleum and hydrocarbons generally are most commonly stored in cylindrical tanks of welded steel. For quantities upto about 250 nos. the cylind...
|
Capacity : 10000 /day |
Plant and Machinery cost: Rs. 1 crores |
|
Working Capital : - |
Rate of Return (ROR): 54.00 |
|
Break Even Point (BEP): 21.00 |
TCI : Rs. 27 crores |
|
Cost of Project : 0 |
Deeply refined pale yellow oils are called white oil. In 1934 the white oil manufacturers association (WOMA) divided the white oils in three viscosity...
|
Capacity : 25 MT/Day |
Plant and Machinery cost: Rs. 950 lakhs |
|
Working Capital : |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 35.00 |
TCI : Rs. 5 crores |
|
Cost of Project : 0 |
Ferro Alloys are the principal alloying agents in iron and steel production. Addition of ferro alloys improves mechanical and physical properties of i...
|
Capacity : 5 MT/Day |
Plant and Machinery cost: Rs. 2 crores |
|
Working Capital : - |
Rate of Return (ROR): 50.00 |
|
Break Even Point (BEP): 41.00 |
TCI : Rs. 5 crores |
|
Cost of Project : 0 |