Aluminium, the wonder metal of today and tomorrow, is poised for a remarkable growth. The specific characteristics of aluminium that have led it to a...
|
Capacity : 2 MT/Day |
Plant and Machinery cost: 76 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 52.00 |
|
Break Even Point (BEP): 37.00 |
TCI : 313 Lakhs |
|
Cost of Project : 0 |
Fuel bricks from the different raw materials now a days are very popular for the resources of renewable energy. There is great efforts have been taken...
|
Capacity : 3600 MT/Annum |
Plant and Machinery cost: 3 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 40.00 |
|
Break Even Point (BEP): 53.00 |
TCI : 52 Lakhs |
|
Cost of Project : 0 |
Perforated bricks are light in weight and provide better thermal insulation as compared to common bricks. Now in India there is a very good growth of...
|
Capacity : 60 Lakhs Bricks /Annum |
Plant and Machinery cost: 27 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 39.00 |
TCI : 135 Lakhs |
|
Cost of Project : 0 |
When a metal is rolled, extruded or drawn at temperature below the recrystallization, the metal is cold worked. The cold rolling mills use hot rolled...
|
Capacity : 200 MT/Day |
Plant and Machinery cost: Rs. 16 Crores |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 46.00 |
TCI : Rs. 67 Crores |
|
Cost of Project : 0 |
Wire mesh is known as wire netting, which is supplied in various types of meshes and for various purposes. It is used by the builders i.e. fencing lig...
|
Capacity : 10 MT/Day |
Plant and Machinery cost: 23 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 53.00 |
|
Break Even Point (BEP): 34.00 |
TCI : 181 Lakhs |
|
Cost of Project : 0 |
Glass is one of the man’s most valuable and versatile materials. About 700 different compositions are in thousands use. Glass is formed from those ele...
|
Capacity : 15 MT/Day |
Plant and Machinery cost: 105 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 58.00 |
|
Break Even Point (BEP): 44.00 |
TCI : 279 Lakhs |
|
Cost of Project : 0 |
It is dark solid form of carbon, produced from the thermal decomposition and polymerization of heavy liquid hydrocarbons that are derived from crude o...
|
Capacity : 30.00 MT/day |
Plant and Machinery cost: Rs. 271 Lacs |
|
Working Capital : - |
Rate of Return (ROR): 49.00 |
|
Break Even Point (BEP): 39.00 |
TCI : Rs. 1386 Lacs |
|
Cost of Project : 0 |
Aluminium is the most abundant metal in the world. When it is alloyed with other material like magnesium, is employed in structures for air craft, aut...
|
Capacity : Aluminium Bar 40000 MT, Aluminium Profiles 20000( Per Annum) |
Plant and Machinery cost: RS. 258 Crores |
|
Working Capital : RS. 364 Crores |
Rate of Return (ROR): 38.00 |
|
Break Even Point (BEP): 54.00 |
TCI : - |
|
Cost of Project : 0 |
Meter Gauge Concrete Sleeper has a resilient bar; attached with flanges, key insert, refraining black and rail. It can bear variable compression load...
|
Capacity : 100.00 NOS/day |
Plant and Machinery cost: Rs. 42 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 36.00 |
TCI : Rs. 254 Lakhs |
|
Cost of Project : 0 |
Conduit pipe is a product through which electric wiring is passed in order to keep it safe. It is manufactured from hot rolled or cold rolled sheets....
|
Capacity : 15.00 MT/day |
Plant and Machinery cost: Rs. 1 Crores |
|
Working Capital : - |
Rate of Return (ROR): 58.00 |
|
Break Even Point (BEP): 35.00 |
TCI : Rs. 6 Crores |
|
Cost of Project : 0 |
Synthetic iron oxides possess good tinting strength and excellent hiding powder. It is also light fast, resistant to alkalies and is available in yell...
|
Capacity : 5.00 MT/day |
Plant and Machinery cost: Rs. 61 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 40.00 |
TCI : Rs. 286 Lakhs |
|
Cost of Project : 0 |
Rice husk gives a good quality of pozzolanio ash containing silica, which is considered a good substitute for cement. It is prepared by first burning...
|
Capacity : 50 MT/day |
Plant and Machinery cost: Rs. 98 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 54.00 |
TCI : Rs. 203 Lakhs |
|
Cost of Project : 0 |