Please choose a project below related to this category.
Solvent cement refers to any substance inorganic or organic synthetic that is capable of bonding other substances together by surface attachment. Pol...
|
Capacity : 500 Kg. / Day |
Plant and Machinery cost: 10 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 36.00 |
TCI : 104 Lakhs |
|
Cost of Project : 0 |
Castings of suitable shape and size intended for subsequent hot working are termed as ingots. Ingot iron has very low carbon in steel. This is general...
|
Capacity : 60,000 MT / Annum |
Plant and Machinery cost: 4012 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 30.00 |
TCI : 6454 Lakhs |
|
Cost of Project : 0 |
Electrical power cables used for transmission and distribution purposes consist of conductors stranded from plain high conductively annealed copper w...
|
Capacity : 2050 MT Aluminium Power Cable/Annum 350 MT Copper Power Cable/Annum |
Plant and Machinery cost: Rs. 80 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 60.00 |
TCI : Cost of Project Rs. 305 Lakhs |
|
Cost of Project : 0 |
Aluminium extrusion products are widely used in transport industry, rail roads, electronics and housing industry etc. The manufacturing of extruded pr...
|
Capacity : 2 MT/day |
Plant and Machinery cost: 75 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 52.00 |
|
Break Even Point (BEP): 37.00 |
TCI : 313 Lakhs |
|
Cost of Project : 0 |
Polishes usually contain several kind of natural and synthetic waxes, paraffin waxes, resins, solvents, auxiliary agents and water. As well as the re...
|
Capacity : 7600 Nos. Bottles / day |
Plant and Machinery cost: Rs. 6 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 41.00 |
TCI : Rs. 64 Lakhs |
|
Cost of Project : 0 |
It is an important structural & ornamental stone because of its higher compressive strength & durability, is extensively used for massive structural...
|
Capacity : 30000 Sq. Mtr./Annum |
Plant and Machinery cost: 196 Lakhs |
|
Working Capital : |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 78.00 |
TCI : Cost of Project 293 Lakhs |
|
Cost of Project : 29300000 |
Heavy liquid paraffin by virtue of its versatile use in pharmaceuticals and medical practice etc.. The paraffin hydrocarbons are usually obtained sim...
|
Capacity : 120000 KLs/Annum |
Plant and Machinery cost: 318 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 40.00 |
|
Break Even Point (BEP): 59.00 |
TCI : Cost of Project 682 Lakhs |
|
Cost of Project : 0 |
Stoneware pipes are used in sewerage lines. It is covered under the heading Structural Clay Product, which include the various items like building br...
|
Capacity : 12 MT/day |
Plant and Machinery cost: 31 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 45.00 |
TCI : 126 Lakhs |
|
Cost of Project : 0 |
Pipes are the transporting tools used for carrying and transporting liquids like crude and refined petroleum oils, water, chemical and gases. With th...
|
Capacity : 300000 MT/Annum |
Plant and Machinery cost: 123 Crores |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 51.00 |
TCI : Cost of Project 187 Crores |
|
Cost of Project : 0 |
Heavy liquid paraffin by virtue of its versatile use in pharmaceuticals and medical practice etc.. The paraffin hydrocarbons are usually obtained sim...
|
Capacity : 120000 KLs/Annum |
Plant and Machinery cost: 318 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 40.00 |
|
Break Even Point (BEP): 59.00 |
TCI : 682 Lakhs |
|
Cost of Project : 0 |
The importance of iron & steel among other materials is well known for industrialization and national economy. Metal fabrication is the group of enti...
|
Capacity : 2 MT/day |
Plant and Machinery cost: 25 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 47.00 |
|
Break Even Point (BEP): 40.00 |
TCI : 131 Lakhs (W/c. 2 month) |
|
Cost of Project : 0 |
Aluminium, the second most plentiful metallic element on earth, became an economic competitor in engineering applications as recently as the end of th...
|
Capacity : 6000 MT/Annum |
Plant and Machinery cost: 322 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 40.00 |
|
Break Even Point (BEP): 63.00 |
TCI : 692 Lakhs |
|
Cost of Project : 0 |