Please choose a project below related to this category.
It is an important structural & ornamental stone because of its higher compressive strength & durability, is extensively used for massive structural...
|
Capacity : 30000 Sq. Mtr./Annum |
Plant and Machinery cost: 196 Lakhs |
|
Working Capital : |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 78.00 |
TCI : Cost of Project 293 Lakhs |
|
Cost of Project : 29300000 |
Heavy liquid paraffin by virtue of its versatile use in pharmaceuticals and medical practice etc.. The paraffin hydrocarbons are usually obtained sim...
|
Capacity : 120000 KLs/Annum |
Plant and Machinery cost: 318 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 40.00 |
|
Break Even Point (BEP): 59.00 |
TCI : Cost of Project 682 Lakhs |
|
Cost of Project : 0 |
Stoneware pipes are used in sewerage lines. It is covered under the heading Structural Clay Product, which include the various items like building br...
|
Capacity : 12 MT/day |
Plant and Machinery cost: 31 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 45.00 |
TCI : 126 Lakhs |
|
Cost of Project : 0 |
Pipes are the transporting tools used for carrying and transporting liquids like crude and refined petroleum oils, water, chemical and gases. With th...
|
Capacity : 300000 MT/Annum |
Plant and Machinery cost: 123 Crores |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 51.00 |
TCI : Cost of Project 187 Crores |
|
Cost of Project : 0 |
Heavy liquid paraffin by virtue of its versatile use in pharmaceuticals and medical practice etc.. The paraffin hydrocarbons are usually obtained sim...
|
Capacity : 120000 KLs/Annum |
Plant and Machinery cost: 318 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 40.00 |
|
Break Even Point (BEP): 59.00 |
TCI : 682 Lakhs |
|
Cost of Project : 0 |
The importance of iron & steel among other materials is well known for industrialization and national economy. Metal fabrication is the group of enti...
|
Capacity : 2 MT/day |
Plant and Machinery cost: 25 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 47.00 |
|
Break Even Point (BEP): 40.00 |
TCI : 131 Lakhs (W/c. 2 month) |
|
Cost of Project : 0 |
Aluminium, the second most plentiful metallic element on earth, became an economic competitor in engineering applications as recently as the end of th...
|
Capacity : 6000 MT/Annum |
Plant and Machinery cost: 322 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 40.00 |
|
Break Even Point (BEP): 63.00 |
TCI : 692 Lakhs |
|
Cost of Project : 0 |
Casting is the oldest form of metal shaping and is still the basic engineering process since most metals are melted and cast from ores. Casting are ma...
|
Capacity : 1200 MT/Annum |
Plant and Machinery cost: 132 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 39.00 |
|
Break Even Point (BEP): 67.00 |
TCI : Cost of Project Rs. 262 Lakhs |
|
Cost of Project : 26200000 |
Mill and straw boards are thicker, heavier and less flexible than the convention paper. The thickness of board is the thickness of a single sheet boar...
|
Capacity : 5 MT/day |
Plant and Machinery cost: Rs. 39 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 38.00 |
TCI : Rs.169 lakhs |
|
Cost of Project : 0 |
The term ˜plywood covers a form of laminated caves in which successive layers of veneer are ordinarily cross laminated, the care of which may be venee...
|
Capacity : 23333 SQM/day |
Plant and Machinery cost: Rs. 43 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 50.00 |
|
Break Even Point (BEP): 44.00 |
TCI : Rs. 404 lakhs |
|
Cost of Project : 0 |
Piping may represent as much as 25 percent of the cost of a chemical-process plant. The installed cost of piping systems varies widely with the materi...
|
Capacity : 1500 MT / Annum Tubes, 600 MT/Annum Fittings |
Plant and Machinery cost: 554 Lakhs |
|
Working Capital : |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 48.00 |
TCI : Cost of Project : 752 Lakhs |
|
Cost of Project : 0 |
Natural fireclays were the raw materials for the first refractories. Their usefulness in this respect is founded on the high proportion of clay minera...
|
Capacity : 15000 MT / Annum |
Plant and Machinery cost: 145 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 36.00 |
TCI : Cost of Project : 370 Lakhs |
|
Cost of Project : 37000000 |