Please choose a project below related to this category.
Engine oil becomes contaminated with foreign material in service. In circulating systems, where a substantial quantity of oil is involved, it is desir...
|
Capacity : 1 MT/day |
Plant and Machinery cost: Rs. 20 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 41.00 |
TCI : Rs. 100 Lakhs |
|
Cost of Project : 0 |
A lifting hook comprising a suspension part fitted with a suspension shaft, which supports a hook part provided with a slot. A safety latch is pivotal...
|
Capacity : 5 MT/day |
Plant and Machinery cost: Rs. 57 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 48.00 |
|
Break Even Point (BEP): 33.00 |
TCI : Rs. 352 lakhs |
|
Cost of Project : 0 |
Steel is considered to be the strongest material in that price. Day to day life and growth of industry and infrastructure in any country totally depen...
|
Capacity : 5000 MT/Day |
Plant and Machinery cost: Rs. 156 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 52.00 |
|
Break Even Point (BEP): 21.00 |
TCI : Rs. 2396 lakhs |
|
Cost of Project : 0 |
The production of G.I. Wire from H.B. wire is not complicated. In case of H.B. wire drawing from H.B. bars, certain mechanical process is used. An imp...
|
Capacity : 8.00 MT./day |
Plant and Machinery cost: Rs. 70 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 32.00 |
TCI : Rs. 419 lakhs |
|
Cost of Project : 0 |
Bulk petroleum and hydrocarbons generally are most commonly stored in cylindrical tanks of welded steel. For quantities upto about 250 nos. the cylind...
|
Capacity : 10000 /day |
Plant and Machinery cost: Rs. 1 crores |
|
Working Capital : - |
Rate of Return (ROR): 54.00 |
|
Break Even Point (BEP): 21.00 |
TCI : Rs. 27 crores |
|
Cost of Project : 0 |
Deeply refined pale yellow oils are called white oil. In 1934 the white oil manufacturers association (WOMA) divided the white oils in three viscosity...
|
Capacity : 25 MT/Day |
Plant and Machinery cost: Rs. 950 lakhs |
|
Working Capital : |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 35.00 |
TCI : Rs. 5 crores |
|
Cost of Project : 0 |
Ferro Alloys are the principal alloying agents in iron and steel production. Addition of ferro alloys improves mechanical and physical properties of i...
|
Capacity : 5 MT/Day |
Plant and Machinery cost: Rs. 2 crores |
|
Working Capital : - |
Rate of Return (ROR): 50.00 |
|
Break Even Point (BEP): 41.00 |
TCI : Rs. 5 crores |
|
Cost of Project : 0 |
A larger part of the average family's food bill goes on protein foods e.g. cheese, eggs and fish etc., which are important parts of a healthy and well...
|
Capacity : 4 Ton/Day |
Plant and Machinery cost: Rs. 90 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 53.00 |
|
Break Even Point (BEP): 31.00 |
TCI : Rs. 5 crores |
|
Cost of Project : 0 |
Indian traditions are so rich and our emotional standards are so high that most of the ceremonies/functions become simply a monument of show-off and e...
|
Capacity : - |
Plant and Machinery cost: 39 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 75.00 |
|
Break Even Point (BEP): 29.00 |
TCI : 496 Lakhs |
|
Cost of Project : 0 |
Water resistance or proofing is an important factor in health and comfort of building occupants. Water proof construction implies the use of a membran...
|
Capacity : 100 Kg./Day |
Plant and Machinery cost: 2 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 39.00 |
TCI : 11 Lakhs |
|
Cost of Project : 0 |
These are mineral oils and are used to dissipate the heat generated in electric transformers, switches, circuit breakers and motor starters etc. They...
|
Capacity : 100KLS/Day |
Plant and Machinery cost: 1104 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 30.00 |
TCI : 3031 Lakhs |
|
Cost of Project : 0 |
Bolts in various dimensions and head-shapes are available. Bolts can be supplied unfinished, semi-finished and fully finished conditions. U-bolts are...
|
Capacity : 5.00 MT./day |
Plant and Machinery cost: Rs. 152 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 38.00 |
|
Break Even Point (BEP): 48.00 |
TCI : Rs. 436 lakhs |
|
Cost of Project : 0 |