Steel is said to be the back bone of any national economy. In India SAIL units in public sector and TISCO in private sector are the integrated steel p...
|
Capacity : 3000 MT / Annum |
Plant and Machinery cost: 88 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 60.00 |
TCI : Cost of Project : 275 Lakhs |
|
Cost of Project : 0 |
Steel is generally produced by removing impurities from pig iron in a basic oxygen furnace or an electric furnace. Steel products are broadly divid...
|
Capacity : 50400 MT/Annum |
Plant and Machinery cost: 2815 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project : 3947 Lakhs |
|
Cost of Project : 0 |
The wax crayons are used for outlining and shading by the artist for drawing. Two types of crayons are produced in India chalk crayons and marking cr...
|
Capacity : 7200 Dozens / Day |
Plant and Machinery cost: 2 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 56.00 |
|
Break Even Point (BEP): 34.00 |
TCI : 50 Lakhs |
|
Cost of Project : 0 |
Steel is the most widely used materials in a large variety of applications. Steel is one of the most recyclable material available-40% produced in th...
|
Capacity : 1785000 MT / Annum |
Plant and Machinery cost: 836 Crores |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 52.00 |
TCI : Cost of Project : 1124 Crores |
|
Cost of Project : 0 |
Silicone is the material on which some fluids are based. Usually, a non-mineral type oil is used in hydraulic brake equipments. It has applications...
|
Capacity : 1 MT / Day |
Plant and Machinery cost: 9 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 52.70 |
|
Break Even Point (BEP): 33.32 |
TCI : 2 Crores |
|
Cost of Project : 0 |
Calcium always occurs in the combined state. The most important naturally occurring compounds of calcium are calcium sulphate in mineral anhydrite an...
|
Capacity : 60,000 MT / A (Gypsum Powder), 3000 Thousand Sq. MT/A (Gypsum Board),600 Thousands Sq. MT/A (PVC Laminated Ceiling Tiles) |
Plant and Machinery cost: 840 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 57.00 |
TCI : Cost of Project : 2352 Lakhs |
|
Cost of Project : 0 |
Pipe fittings are used to connect pieces of pipe made of different materials viz. connecting galvanized to copper or cast-iron drain pipe to transits...
|
Capacity : 1500 MT /Annum |
Plant and Machinery cost: 101 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 52.00 |
TCI : Cost of Project : 280 Lakhs |
|
Cost of Project : 0 |
Cement is used to designate many different kinds of substances that are used as binders. After the 19th century, there were certain process improveme...
|
Capacity : 60,00,000 MT/Annum Portland Cement |
Plant and Machinery cost: Rs. 121 Crores |
|
Working Capital : - |
Rate of Return (ROR): 37.00 |
|
Break Even Point (BEP): 70.00 |
TCI : Cost of Project : Rs. 261 Crores |
|
Cost of Project : 2610000000 |
Bricks are the most common building materials. It is a mixture of clay and sand and small quantities of limes Bricks and classified accordingly to th...
|
Capacity : 20000 Nos. /Day |
Plant and Machinery cost: 13 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.40 |
|
Break Even Point (BEP): 42.26 |
TCI : 110 Lakhs |
|
Cost of Project : 0 |
Plaster of Paris or simply plaster, is a type of building material based on calcium sulphate hemihydrate. It is created by heating. Gypsum to about 1...
|
Capacity : 50 MT / Day |
Plant and Machinery cost: 47 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 49.00 |
|
Break Even Point (BEP): 45.00 |
TCI : 3 Crores |
|
Cost of Project : 0 |
The purpose of a transmission line tower is to support conductors carrying electrical power and one or two ground wires at suitable distances above t...
|
Capacity : 24,000 MT /Year |
Plant and Machinery cost: 149 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 53.00 |
TCI : Cost of Project : 716 Lakhs |
|
Cost of Project : 0 |
In the most general sense of the word, cement is a binder, a substance which sets and hardens independently, and can bind other materials together. Th...
|
Capacity : 4000 Bag / Day |
Plant and Machinery cost: 3 Crore |
|
Working Capital : - |
Rate of Return (ROR): 59.00 |
|
Break Even Point (BEP): 36.00 |
TCI : 10 Crore |
|
Cost of Project : 0 |