Please choose a project below related to this category.
Metals is general and steel particular can be worked into useful shapes by hammering or pressing. This method of metal working is known as forging. A...
|
Capacity : 90 MT/Day |
Plant and Machinery cost: 631 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 49.00 |
|
Break Even Point (BEP): 32.00 |
TCI : 2926 Lakhs |
|
Cost of Project : 0 |
Steel shots and grits are used in both static and site blasting equipments. Materials and abrasives used for surface preparation can be hazardous if u...
|
Capacity : 30 MT/Day |
Plant and Machinery cost: 203 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 54.00 |
|
Break Even Point (BEP): 30.00 |
TCI : 858 Lakhs |
|
Cost of Project : 0 |
Piping may represent as much as 25% of the cost of a chemical process plant. The economics depends heavily on the pipe size and fabrication techniques...
|
Capacity : 300000 Nos./Day |
Plant and Machinery cost: 54 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 57.00 |
TCI : 195 Lakhs |
|
Cost of Project : 0 |
A solvent is a liquid which disperses a solid or semi solid substance so as to yield a useful solution. Such a liquid is termed simply diluents. Thin...
|
Capacity : 1000 Ltrs./Day |
Plant and Machinery cost: 8 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 41.00 |
TCI : 61 Lakhs |
|
Cost of Project : 0 |
Date is one of the best fruits, which contains fructose as sugar ingredients, which is totally fermentable sugar and can be completely converted to et...
|
Capacity : 10000 Ltrs./Day |
Plant and Machinery cost: 815 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 30.00 |
|
Break Even Point (BEP): 57.00 |
TCI : 1264 Lakhs |
|
Cost of Project : 0 |
There is large use of animal feed in India, Middle East and also in the European Countries. It will help to increase the animal health. Most of the ra...
|
Capacity : 50 MT/Day |
Plant and Machinery cost: Rs. 70 Lacs |
|
Working Capital : - |
Rate of Return (ROR): 49.00 |
|
Break Even Point (BEP): 39.00 |
TCI : Rs. 480 Lacs |
|
Cost of Project : 0 |
Aluminum wrought products are those aluminium products that have been subjected to plastic deformation by hot working and cold working process. These...
|
Capacity : 40 MT/Day |
Plant and Machinery cost: Rs. 3450 Lacs |
|
Working Capital : - |
Rate of Return (ROR): 38.00 |
|
Break Even Point (BEP): 40.00 |
TCI : RS. 105 Crores |
|
Cost of Project : 0 |
The concept of mosquito repellent candle is a new one which serve the purpose of enlightment as well as mosquito repellency. It is more efficiently us...
|
Capacity : 500 kg/Day |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Today we find iron and steels of so many types and their products so wide spread all around, that it is hard to think if the world could progress any...
|
Capacity : 10 Lakhs MT/Day |
Plant and Machinery cost: 38 Crores |
|
Working Capital : - |
Rate of Return (ROR): 48.00 |
|
Break Even Point (BEP): 29.00 |
TCI : 388 Crores |
|
Cost of Project : 0 |
Aluminium, the wonder metal of today and tomorrow, is poised for a remarkable growth. The specific characteristics of aluminium that have led it to a...
|
Capacity : 2 MT/Day |
Plant and Machinery cost: 76 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 52.00 |
|
Break Even Point (BEP): 37.00 |
TCI : 313 Lakhs |
|
Cost of Project : 0 |
Fuel bricks from the different raw materials now a days are very popular for the resources of renewable energy. There is great efforts have been taken...
|
Capacity : 3600 MT/Annum |
Plant and Machinery cost: 3 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 40.00 |
|
Break Even Point (BEP): 53.00 |
TCI : 52 Lakhs |
|
Cost of Project : 0 |
Perforated bricks are light in weight and provide better thermal insulation as compared to common bricks. Now in India there is a very good growth of...
|
Capacity : 60 Lakhs Bricks /Annum |
Plant and Machinery cost: 27 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 39.00 |
TCI : 135 Lakhs |
|
Cost of Project : 0 |