Please choose a project below related to this category.
Aluminium is a versatile non-ferrous metal having around 3000 identified uses. Powder metallurgy have being defined as the Art and Science of manufact...
|
Capacity : 20 MT /Day |
Plant and Machinery cost: 547 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 35.00 |
TCI : 3162 Lakhs |
|
Cost of Project : 0 |
Aluminium is the second most abundant metallic element in the earth crust after silicon, yet it is comparatively new industrial metal that has been pr...
|
Capacity : 25000 MT/Year |
Plant and Machinery cost: 290 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 72.00 |
TCI : Cost of Project : 2815 Lakhs |
|
Cost of Project : 0 |
Aluminium is one of the metal, which is widely available in many countries. There are various uses of aluminium metal of which manufacturing of alumin...
|
Capacity : 9000 MT/Year |
Plant and Machinery cost: 90 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 70.00 |
TCI : Cost of Project : 620 Lakhs |
|
Cost of Project : 0 |
Today the food containers that are being used in our daily living extend over the widest range, from those which are raw material of new materials suc...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Aluminium is a metal with high strength-to weight ratio, better formability, high ductility, anti-corrosive properties with thermal and electrical con...
|
Capacity : 21600 MT/Year |
Plant and Machinery cost: 410 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 63.00 |
TCI : Cost of Project : 2020 Lakhs |
|
Cost of Project : 202000000 |
Aluminium is second most plentiful metallic element on earth become an economic competitor in engineering applications. The aluminium industry growth...
|
Capacity : 144000 MT/Annum |
Plant and Machinery cost: 395 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 63.00 |
TCI : Cost of Project : 1147 Lakhs |
|
Cost of Project : 114700000 |
Hot rolling, also called hot working, is a metallurgical process of in which large pieces of metal such as slabs or billets are deformed between rolle...
|
Capacity : 10,00,000 MT / Annum |
Plant and Machinery cost: 79 Crores |
|
Working Capital : - |
Rate of Return (ROR): 47.00 |
|
Break Even Point (BEP): 55.00 |
TCI : Cost of Project : 197 Crores |
|
Cost of Project : 0 |
Thermo Mechanical Treatment (TMT) is a term used to describe a variety of process combining controlled thermal and deformation treatment to obtain syn...
|
Capacity : 50,000 MT/Annum |
Plant and Machinery cost: 310 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 74.00 |
TCI : Cost of Project : 1189 Lakhs |
|
Cost of Project : 0 |
Steel is a generic name for a group of ferrous metals due to their abundance durability versatility and low costs are most useful metallic material k...
|
Capacity : 1,00,000 MT / Annum |
Plant and Machinery cost: 608 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 64.00 |
TCI : Cost of Project : 2808 Lakhs |
|
Cost of Project : 0 |
The alcohol based chemical industry is worth around Rs. 5,000 crores in terms of total investment or (US$ 1.15 billion) and contributes Rs. 500 crores...
|
Capacity : 1000 Ltrs./Day |
Plant and Machinery cost: 17 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 58.00 |
|
Break Even Point (BEP): 31.00 |
TCI : 150 Lakhs |
|
Cost of Project : 0 |
-
|
Capacity : 15000 Broilers, 4 Lakhs Eggs, 500 Birds/Annum |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 64.00 |
TCI : 16 lakhs |
|
Cost of Project : 0 |
-
|
Capacity : 1000 MT/Annum |
Plant and Machinery cost: Rs. 194 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 43.00 |
TCI : Rs. 598 Lakhs |
|
Cost of Project : 0 |