Please choose a project below related to this category.
Sponge iron is the product created when iron ore is reduced to metallic iron, usually with some kind of carbon (charcoal, etc), at temperatures below...
|
Capacity : 135000 MT / Annum |
Plant and Machinery cost: 7175 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 25.00 |
TCI : Cost of Project : 8923 Lakhs |
|
Cost of Project : 0 |
-
|
Capacity : 10 MT/Day |
Plant and Machinery cost: Rs. 2 Crores |
|
Working Capital : - |
Rate of Return (ROR): 47.00 |
|
Break Even Point (BEP): 36.00 |
TCI : Rs. 13 crores |
|
Cost of Project : 0 |
India is a booming hospitality market, yet it has minuscule contribution to the timeshare business model existing worldwide. USA alone comprises two-...
|
Capacity : 30 Room |
Plant and Machinery cost: 147 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 35.00 |
TCI : 1239 Lakhs |
|
Cost of Project : 0 |
For vacuum distillation of crude coal tar, the crude coal tar is produced from coke ovens of steel plant, 50% of this crude coal tar is pitch. The cr...
|
Capacity : 7500 MT / Annum |
Plant and Machinery cost: Rs. 137 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 57.00 |
TCI : Cost of Project : 320 Lakhs |
|
Cost of Project : 0 |
Teflon, a perfluorinated straight-chain high polymer is made by polymerizing the tetrafluoroethylene. It is a high crystalline polymer and goes throu...
|
Capacity : 100 Kg./Day |
Plant and Machinery cost: 13 Lakh |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 37.00 |
TCI : 92 Lakh |
|
Cost of Project : 0 |
Lime is manufactured from lime stone. Lime is mainly used for manufacture of hydrated lime. Hydrated lime is a dry powder obtained by treating quick...
|
Capacity : 600 MT/Day |
Plant and Machinery cost: 131 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 24.00 |
|
Break Even Point (BEP): 42.00 |
TCI : Cost of Project : 548 Lakhs |
|
Cost of Project : 0 |
Fly Ash required for the production of Fly Ash Bricks, the raw Fly Ash is subjected to Triboelectrostatic Beneficiation process making use of separat...
|
Capacity : 12,000 Nos. / Day |
Plant and Machinery cost: 260 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 40.00 |
TCI : Cost of Project : 655 Lakhs |
|
Cost of Project : 0 |
The growth of the tile industry has shown steep fluctuations. The great upsurge of developmental activities all over the country during the second an...
|
Capacity : 2,00,000 Nos. / Day |
Plant and Machinery cost: 36 Lakh |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 43.00 |
TCI : 151 Lakh |
|
Cost of Project : 0 |
The world ceramic is taken to cover those articles that are made from inorganic substances first shaped and then hardened by fir. The characteristics...
|
Capacity : 4500 Nos. / Day |
Plant and Machinery cost: Rs. 15 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 43.00 |
TCI : 75 Lakhs |
|
Cost of Project : 0 |
Manufacturing of steel tubes & pipes a Mechanical Engineering is mostly produced in large scale. ERW steel tubes are chiefly used in bicycles, transf...
|
Capacity : 3600 MT / Annum |
Plant and Machinery cost: 115 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 57.00 |
TCI : Cost of Project : 234 Lakhs |
|
Cost of Project : 0 |
There are various processes by which metal can be shaped such as forging, extrusions, pressing, welding, rolling and costing. Among the various proce...
|
Capacity : 18000 MT / Annum |
Plant and Machinery cost: 173 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 64.00 |
TCI : Cost of Project : 499 Lakhs |
|
Cost of Project : 0 |
Iron ore pellets are used in blast furnaces for producing sponge iron & steels. Marked by high productivity lower fuel consumption and improved furnac...
|
Capacity : 6000 MT / Annum |
Plant and Machinery cost: 187 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 46.00 |
TCI : Cost of Project : 479 Lakhs |
|
Cost of Project : 0 |